Assessment of Testing Needs and Test Facilities for the Lunar Dust Management Project

被引:0
|
作者
Kohli, Rajiv [1 ]
Boulavsky, Michael [1 ]
Yee, Harry [2 ]
Fishman, Julianna [3 ]
Craven, Paul [4 ]
Easter, Robert [5 ]
Hyatt, Mark [6 ]
机构
[1] Aerosp Corp, 2525 Bay Area Blvd,Suite 600, Houston, TX 77058 USA
[2] NASA, Ames Res Ctr, Moffett Field, CA 94035 USA
[3] Univ Calif Santa Cruz, NASA, Ames Res Ctr, Univ Affiliated Res Ctr, Moffett Field, CA 94035 USA
[4] NASA, Marshall Space Flight Ctr, Huntsville, AL 35812 USA
[5] Jet Prop Lab, Pasadena, CA 91109 USA
[6] NASA, Glenn Res Ctr, Cleveland, OH 44135 USA
关键词
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
The NASA Dust Management Project has been established to address relevant high priority needs for lunar dust mitigation technologies to be used during lunar surface operations. (1) (2) A key task of the project is to support the assessment of test planning and test facility requirements for dust mitigation technology evaluation and demonstration. The overall objectives of the assessment include a) delineation of testing philosophy and needs and b) the identification and evaluation of the capabilities of available and suitable NASA and non-NASA test facilities to identify potential gaps between testing needs and current operational testing capabilities. The approach, methodology and initial results of this ongoing assessment are described in this paper.
引用
下载
收藏
页数:7
相关论文
共 50 条
  • [31] ASSESSMENT OF HOSPITAL MANAGEMENT NEEDS
    DAGNEW, M
    ZAKUS, D
    ETHIOPIAN MEDICAL JOURNAL, 1995, 33 (04) : 219 - 226
  • [32] Needs assessment in concussion management
    Franks, MJ
    Sautter, SW
    Jackson, LD
    CLINICAL NEUROPSYCHOLOGIST, 2005, 19 (3-4) : 539 - 540
  • [33] Laboratory testing and data analysis of the Electrostatic Lunar Dust Analyzer (ELDA) instrument
    Xie, J.
    Sternovsky, Z.
    Auer, S.
    Drake, K.
    Gruen, E.
    Horanyi, M.
    Le, H.
    Srama, R.
    PLANETARY AND SPACE SCIENCE, 2013, 89 : 63 - 70
  • [34] A needs assessment study for the Missouri Telehospice Project
    Parker-Oliver, D
    Demiris, G
    GERONTOLOGIST, 2003, 43 : 421 - 421
  • [35] Experience of testing the Class 92 on the Velim test facilities
    Jacks, M
    RAILWAY ROLLING STOCK, 1996, 1996 (17): : 137 - 142
  • [36] DEVELOPMENT AND TESTING OF THE MIT ACOUSTIC LEVITATION TEST FACILITIES
    LUPI, VD
    HANSMAN, RJ
    JOURNAL OF ATMOSPHERIC AND OCEANIC TECHNOLOGY, 1991, 8 (04) : 541 - 552
  • [37] 3-PHASE TESTING FACILITIES AT EPRIS PROJECT UHV
    COMBER, MG
    DOYLE, JR
    SCHNEIDER, HM
    ZAFFANELLA, LE
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1976, 95 (05): : 1590 - 1599
  • [38] ASSESSMENT OF STATE AND REGIONAL NEEDS FOR HAZARDOUS-WASTE FACILITIES
    BERKOWITZ, JB
    HAZARDOUS WASTE & HAZARDOUS MATERIALS, 1984, 1 (02): : 249 - 264
  • [39] Project assessment: A tool for improving project management
    Purvis, RL
    McCray, GE
    INFORMATION SYSTEMS MANAGEMENT, 1999, 16 (01) : 55 - 60
  • [40] Facilities management: an analysis of evolving educational needs in a developing profession
    Hauptfleisch, Dries
    ACTA STRUCTILIA, 2008, 15 (01) : 133 - 141