Elimination of modal collision: railway bridge over the Regalica River

被引:1
|
作者
Bernacki, Dariusz [1 ]
Lis, Christian [2 ]
机构
[1] Maritime Univ Szczecin, Szczecin, Poland
[2] Univ Szczecin, Szczecin, Poland
来源
SCIENTIFIC JOURNALS OF THE MARITIME UNIVERSITY OF SZCZECIN-ZESZYTY NAUKOWE AKADEMII MORSKIEJ W SZCZECINIE | 2019年 / 59卷 / 131期
关键词
elimination; collision; railway bridge; inland navigation; transport; systems;
D O I
10.17402/351
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
This study aims to identify and quantify the economic benefits of eliminating collisions between two transport systems: rail and inland waterway transport. The collision between transport systems is caused here by the obsolete structure of a railway drawbridge, which constitutes an element of the railway line used by freight and passenger transport and is located on the main inland waterway used by inland waterways freight transport. Railway transport results in limitations of inland waterway transport and, vice versa, inland waterways transport blocks railway transport during lifting of the bridge span. In the case of railway transport, the low capacity of the single-track railway bridge constitutes an additional limitation of the development of transportation. There are plans to eliminate the collision in the regional transport system by constructing a new railway bridge in place of the old drawbridge. The effects of the transportation infrastructure improvement were measured directly for both rail and inland water freight systems as well as the result of the interaction between passenger rail and car and bus transport. In order to compare the different types of impact, the effects of different actions were valued in monetary terms. The planned intervention, as investigated here, will lead to reductions in the cost of time of inland waterways freight transport and costs of time of rail passenger and freight transport and a decrease in the external costs of transport. This will make possible transportation services that are both cheaper and more reliable.
引用
收藏
页码:43 / 52
页数:10
相关论文
共 50 条
  • [31] OPERATIONAL MODAL ANALYSIS IN MODEL UPDATING OF A TRUSS RAILWAY BRIDGE
    Poprawa, G.
    Salamak, M.
    Pradelok, S.
    Lazinski, P.
    7TH IOMAC: INTERNATIONAL OPERATIONAL MODAL ANALYSIS CONFERENCE, 2017, : 64 - 67
  • [32] The new railway bridge over the Rhein in Wesel
    Ehrenberg, R
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1928, 72 : 485 - 490
  • [33] Railway bridge over Sodertalje Canal, Sweden
    Thulstrup, Michael
    Nielsen, Jens Praest
    Nilsson, Mattias
    Hallmark, Robert
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2011, 164 (03) : 123 - 132
  • [34] Railway bridge of Ludwigshafen over the Rhein.
    Bernhard, R
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1932, 76 : 1266 - 1268
  • [35] Constructing well foundations for a railway bridge on river Chambal
    Dubey, R.S.
    Indian Concrete Journal, 2001, 75 (09): : 593 - 597
  • [36] Repair of the railway bridge over the river Main near Stockstadt - substitution of the shore spans at record speed
    Adomeit, Roland
    Springer, Johannes
    Hanf, Manfred
    Groneberg-Kloft, Beatrix
    Berndorfer, Claus
    STAHLBAU, 2021, 90 (01) : 46 - 56
  • [37] Stability of a train running over the Volga river high-speed railway bridge during crosswinds
    Montenegro, Pedro Aires
    Calcada, Rui
    Carvalho, Hermes
    Bolkovoy, Alexander
    Chebykin, Ivan
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2020, 16 (08) : 1121 - 1137
  • [38] The new bridge over the Po river for the new railway line high capacity Bologna-Milan
    Il nuovo ponte ferroviario sul Po per la linea AV Bologna-Milano
    2001, Collegio Ingegneria Ferroviaria Italiani (56):
  • [39] Ambient loading and modal parameters for the Chulitna River Bridge
    Xiao, Feng
    Chen, Gang S.
    Hulsey, J. Leroy
    Dolan, J. Daniel
    Dong, Yongtao
    ADVANCES IN STRUCTURAL ENGINEERING, 2016, 19 (04) : 660 - 670
  • [40] Design of Main Bridge of Yelang River Bridge on Chongqing-Guiyang Railway
    Guo, Lun-Bo
    Bridge Construction, 2019, 49 (05): : 85 - 90