Design-Build for Transportation Projects: Cost and Schedule Change Performance Analysis

被引:10
|
作者
El Asmar, Mounir [1 ]
Ramsey, David [2 ]
Gibson, G. Edward, Jr. [3 ]
Bearup, Wylie [1 ]
机构
[1] Arizona State Univ, Sch Sustainable Engn & Built Environm, 660 South Coll Ave, Tempe, AZ 85287 USA
[2] Florida Int Univ, Moss Sch Construct Infrastruct & Sustainabil, 10555 West Flagler St, Miami, FL 33137 USA
[3] Arizona State Univ, Sch Sustainable Engn & Built Environm, Construct Engn & Management, 660 South Coll Ave, Tempe, AZ 85287 USA
关键词
D O I
10.1061/(ASCE)LA.1943-4170.0000335
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
Design-build (DB) is an alternative project delivery method that has been used to great effect in transportation project delivery. Measuring the performance of DB projects has been the subject of many research studies. However, the collective results of these studies are difficult to interpret because they extend over decades. This paper seeks to synthesize the past 20 years of DB transportation performance literature, collect data from 47 public DB transportation projects, and compare performance results with those published in the literature. Statistical comparisons are made between the collected DB data and the transportation DB literature in order to determine if there are any performance differences in this new data set versus previously published literature. Results from the performance analysis show that DB has a median cost change of 4% and a median schedule change of zero. This study contributes to the body of knowledge by analyzing project data from 47 public DB transportation projects and combining performance outcomes with two decades of published DB performance transportation literature. The findings consistently show that DB can offer superior performance compared with the traditional design-bid-build method. (C) 2019 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [21] Determinants of successful design-build projects
    Lam, Edmond W. M.
    Chan, Albert P. C.
    Chan, Daniel W. M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (05) : 333 - 341
  • [22] Stipends in Highway Design-Build Projects
    Chaudhary, Niranjan A.
    Esmaeili, Behzad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
  • [24] Value Creation in Design-Build Projects
    Bremdal, Jon Harald
    Haddadi, Amin
    Bjorberg, Svein
    Lohne, Jardar
    Laedre, Ola
    [J]. 2017 12TH INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE ON COMPUTER SCIENCES AND INFORMATION TECHNOLOGIES (CSIT), VOL. 2, 2017, : 58 - 66
  • [25] A Critical Assessment of Material Price Adjustment Clauses for Transportation Design-Build Projects
    Thu, Moe Kyaw
    Hamilton, Parker
    Lee, Jung Hyun
    Kingsley, Gordan
    Ashuri, Baabak
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (03)
  • [26] Precontract Negotiations in Design-Build Projects
    Erkal, Elif Deniz Oguz
    Molenaar, Keith
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 1 - 10
  • [27] Design-build and public works projects
    [J]. Constr Specifier, 3 (56):
  • [28] Concurrent engineering in design-build projects
    Anumba, Chimay J.
    Evbuomwan, Nosa F.O.
    [J]. Construction Management and Economics, 1997, 15 (03): : 271 - 281
  • [29] Design-build approach to renovation projects
    Allen, Gregory L.
    [J]. HPAC Heating, Piping, Air Conditioning, 1996, 68 (09):
  • [30] Advancing Airport Project Delivery: A Comparison of Design-Build and Traditional Methods in Terms of Schedule and Cost Performance
    Khalef, Ramy
    El-adaway, Islam H.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (06)