Performance Evaluation of Start-Up Decisions of Rapid-Start Units for AGC

被引:6
|
作者
Saboya Bautista, Inmaculada [1 ]
Egido, Ignacio [1 ]
Lobato Miguelez, Enrique [1 ]
机构
[1] Univ Pontificia Comillas, Sch Engn ICAI, Madrid 28015, Spain
关键词
Mixed-integer linear programming; Rapid-Start; secondary regulation;
D O I
10.1109/TPWRS.2014.2381360
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Generating units, participating in the secondary frequency control of a control area, are usually spinning units already connected to the network and operating outside their range of optimal performance. This paper deals with an alternative method of providing secondary frequency control called Rapid-Start (RS). It consists in assigning a regulation band to several off-line units (RS units) which are capable of being started and connected rapidly, therefore allowing the online units to operate closer to their nominal power. As RS operation may have economic benefits, an appropriate algorithm to start up an RS unit needs to be developed. This paper proposes a methodology to evaluate, compare, and choose the most appropriate RS algorithm among the ones developed for a certain AGC control area. An optimization model provides a reference by determining the hypothetically ideal start-ups and shut-downs of RS units. In addition, the definition of performance indexes to evaluate, compare, and choose the different RS algorithms is proposed. The proposed methodology is illustrated for a secondary frequency control zone within the Spanish power system by using real data signals.
引用
收藏
页码:3130 / 3138
页数:9
相关论文
共 50 条