Hybrid approach for solving the integrated planning and scheduling production problem

被引:3
|
作者
Ibn Majdoub Hassani, Zineb [1 ]
El Barkany, Abdellah [1 ]
Jabri, Abdelouahhab [1 ]
El Abbassi, Ikram [2 ]
Darcherif, Abdel Moumen [3 ]
机构
[1] Fac Sci & Technol Fez, Mech Engn Lab, Fes, Morocco
[2] ECAM EPMI, LR2E, Cergy Pontoise, France
[3] ECAM EPMI, Grad Sch, Cergy Pontoise, France
关键词
Planning; Operational research; Modelling; Genetic algorithms; Optimization algorithms; Production; Scheduling; Mono criteria; Integrated approach; HSAGA; Simulated annealing; OPTIMIZATION; FLOWSHOP; SYSTEMS;
D O I
10.1108/JEDT-11-2018-0198
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This paper aims to present a new model for solving the integrated production planning and scheduling. Usually, the two decision levels are treated sequentially because of their complexity. Scheduling depends on the lot sizes calculated at the tactical level and ignoring scheduling constraints generates unrealistic and inconsistent decisions. Therefore, integrating more detail scheduling constraint in production planning is important for managing efficiently operations. Therefore, an integrated model was developed, and two evolutionary optimization approaches were suggested for solving it, namely, genetic algorithm (GA) and the hybridization of simulated annealing (SA) with GA HSAGA. The proposed algorithms have some parameters that must be adjusted using Taguchi method. Therefore, to evaluate the proposed algorithm, the authors compared the results given by GA and the hybridization. The SA-based local search is embedded into a GA search mechanism to move the GA away from being closed within local optima. The analysis shows that the combination of simulated annealing with GA gives better solutions and minimizes the total production costs. Design/methodology/approach The paper opted for an approached resolution method particularly GA and simulated annealing. The study represents a comparison between the results found using GA and the hybridization of simulated annealing and GA. A total of 45 instances were studied to evaluate job-shop problems of different sizes. Findings The results illustrate that for 36 instances of 45, the hybridization of simulated annealing and GA HSAGA has provided best production costs. The efficiency demonstrated by HSAGA approach is related to the combination between the exploration ability of GA and the capacity to escape local optimum of simulated annealing. Originality/value This study provides a new resolution approach to the integration of planning and scheduling while considering a new operational constrain. The model suggested aims to control the available capacity of the resources and guaranties that the resources to be consumed do not exceed the real availability to avoid the blocking that results from the unavailability of resources. Furthermore, to solve the MILP model, a GA is proposed and then it is combined to simulated annealing.
引用
收藏
页码:172 / 189
页数:18
相关论文
共 50 条
  • [21] Integrated versus hierarchical approach to aggregate production planning and master production scheduling
    Vogel, Tom
    Almada-Lobo, Bernardo
    Almeder, Christian
    [J]. OR SPECTRUM, 2017, 39 (01) : 193 - 229
  • [22] Integrated versus hierarchical approach to aggregate production planning and master production scheduling
    Tom Vogel
    Bernardo Almada-Lobo
    Christian Almeder
    [J]. OR Spectrum, 2017, 39 : 193 - 229
  • [23] Solving the integrated planning and scheduling problem using variable neighborhood search based algorithms
    Leite, Mario Manuel Silva
    Pinto, Telmo Miguel Pires
    Alves, Claudio Manuel Martins
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2023, 228
  • [24] Modelling and solving an integrated freight train scheduling and trip planning problem with hazardous materials
    Abuobidalla, Omar A.
    Chen, Mingyuan
    Chauhan, Satyaveer S.
    [J]. INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2021, 9 (03) : 256 - 289
  • [25] An empirical study on solving an integrated production and distribution problem with a hybrid strategy
    Li, Feng
    Zhou, Li
    Xu, Guangshu
    Lu, Hui
    Wang, Kai
    Tsai, Sang-Bing
    [J]. PLOS ONE, 2018, 13 (11):
  • [26] An integrated resolution of joint production and maintenance scheduling problem in hybrid flowshop
    Benbouzid-Sitayeb, Fatima
    Tirchi, Mourad
    Mahloul, Abid
    [J]. BIO-INSPIRED MODELING OF COGNITIVE TASKS, PT 1, PROCEEDINGS, 2007, 4527 : 518 - +
  • [27] A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints
    M. R. Amin-Naseri
    Ahmad J. Afshari
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 59 : 273 - 287
  • [28] A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints
    Amin-Naseri, M. R.
    Afshari, Ahmad J.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (1-4): : 273 - 287
  • [29] A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem
    Fu, Yi-Min
    Diabat, Ali
    [J]. APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) : 1194 - 1201
  • [30] Approximate Approach to Deal with the Uncertainty in Integrated Production Scheduling and Maintenance Planning
    Cui W.
    [J]. Journal of Shanghai Jiaotong University (Science), 2020, 25 (01): : 106 - 117