Hybrid approach for solving the integrated planning and scheduling production problem

被引:3
|
作者
Ibn Majdoub Hassani, Zineb [1 ]
El Barkany, Abdellah [1 ]
Jabri, Abdelouahhab [1 ]
El Abbassi, Ikram [2 ]
Darcherif, Abdel Moumen [3 ]
机构
[1] Fac Sci & Technol Fez, Mech Engn Lab, Fes, Morocco
[2] ECAM EPMI, LR2E, Cergy Pontoise, France
[3] ECAM EPMI, Grad Sch, Cergy Pontoise, France
关键词
Planning; Operational research; Modelling; Genetic algorithms; Optimization algorithms; Production; Scheduling; Mono criteria; Integrated approach; HSAGA; Simulated annealing; OPTIMIZATION; FLOWSHOP; SYSTEMS;
D O I
10.1108/JEDT-11-2018-0198
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This paper aims to present a new model for solving the integrated production planning and scheduling. Usually, the two decision levels are treated sequentially because of their complexity. Scheduling depends on the lot sizes calculated at the tactical level and ignoring scheduling constraints generates unrealistic and inconsistent decisions. Therefore, integrating more detail scheduling constraint in production planning is important for managing efficiently operations. Therefore, an integrated model was developed, and two evolutionary optimization approaches were suggested for solving it, namely, genetic algorithm (GA) and the hybridization of simulated annealing (SA) with GA HSAGA. The proposed algorithms have some parameters that must be adjusted using Taguchi method. Therefore, to evaluate the proposed algorithm, the authors compared the results given by GA and the hybridization. The SA-based local search is embedded into a GA search mechanism to move the GA away from being closed within local optima. The analysis shows that the combination of simulated annealing with GA gives better solutions and minimizes the total production costs. Design/methodology/approach The paper opted for an approached resolution method particularly GA and simulated annealing. The study represents a comparison between the results found using GA and the hybridization of simulated annealing and GA. A total of 45 instances were studied to evaluate job-shop problems of different sizes. Findings The results illustrate that for 36 instances of 45, the hybridization of simulated annealing and GA HSAGA has provided best production costs. The efficiency demonstrated by HSAGA approach is related to the combination between the exploration ability of GA and the capacity to escape local optimum of simulated annealing. Originality/value This study provides a new resolution approach to the integration of planning and scheduling while considering a new operational constrain. The model suggested aims to control the available capacity of the resources and guaranties that the resources to be consumed do not exceed the real availability to avoid the blocking that results from the unavailability of resources. Furthermore, to solve the MILP model, a GA is proposed and then it is combined to simulated annealing.
引用
收藏
页码:172 / 189
页数:18
相关论文
共 50 条
  • [1] A hybrid genetic approach for solving an integrated multi-objective operating room planning and scheduling problem
    Guido, Rosita
    Conforti, Domenico
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2017, 87 : 270 - 282
  • [2] Models for Solving Integrated Planning and Scheduling Problem: Computational Comparison
    Hassani, Zineb Ibn Majdoub
    El Barkany, Abdellah
    Jabri, Abdelouahhab
    El Abbassi, Ikram
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2018, 34 : 161 - 170
  • [3] AN INTEGRATED APPROACH TO SOLVING THE MASTER AGGREGATE SCHEDULING PROBLEM
    DAS, SK
    SARIN, SC
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 34 (02) : 167 - 178
  • [4] Solving University Scheduling Problem Using Hybrid Approach
    Shaikh, Aftab Ahmed
    Bukhari, Abdul Hussain Shah
    Memon, Zubair Ahmed
    [J]. MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2011, 30 (04) : 613 - 624
  • [5] A proactive approach to solve integrated production scheduling and maintenance planning problem in flow shops
    Cui, Weiwei
    Lu, Zhiqiang
    Li, Chen
    Han, Xiaole
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 115 : 342 - 353
  • [6] Solving the integrated process planning and scheduling problem using an enhanced constraint programming-based approach
    Shi, Ganquan
    Yang, Zhouwang
    Xu, Yang
    Quan, Yuchen
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (18) : 5505 - 5522
  • [7] A Genetic Approach for Solving a Hybrid Flow Shop Scheduling Problem
    Mahdavi, I.
    Mojarad, M. S.
    Javadi, B.
    Tajdin, A.
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1214 - 1218
  • [8] Hybrid approach for solving resourceconstrained software project scheduling problem
    Gul, Nurhan
    Arici, Nursal
    [J]. JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024,
  • [9] Hybrid Approach to Solving the Problems of Operational Production Planning
    Gladkov, L. A.
    Gladkova, N. V.
    Gromov, S. A.
    [J]. ARTIFICIAL INTELLIGENCE AND ALGORITHMS IN INTELLIGENT SYSTEMS, 2019, 764 : 415 - 424
  • [10] An integrated production planning and scheduling system for hybrid flowshop organizations
    Riane, F
    Artiba, A
    Iassinovski, S
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) : 33 - 48