Probabilistic unit commitment with wind farms considerations

被引:0
|
作者
Hosseini, Seyed Hamid [1 ]
Abbasi, Ehsan [1 ]
机构
[1] Sharif Univ Technol, Dept Elect Engn, Ctr Excellence Power Syst Management & Control, Tehran, Iran
关键词
wind farm; unit commitment; simulated annealing; reliability and emission constraint; restructured power market;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a method for unit commitment in restructured power systems with high penetration of wind farms. As wind is an intermittent source of energy and can not be predicted with high accuracy, reliability of wind farms compare to conventional power plants is lower. By increasing penetration of wind farms in generation system, reliability of power system will decrease. Therefore, reliability constraint should be added to unit commitment (UC) formulation. On the other hand, wind is a green source of energy; additionally environmental crisis is very important issue in the 21(st) century. By adding emission constraint to UC, wind energy will be valued. Both reliability and emission constraints are acing as fuzzy constraints. It means that if the UC solution exceeds these constraints limits, that configuration of UC will be penalized by adding augmented cost to total UC cost. To implement these constraints to UC, simulated annealing (SA) has been used because it converges very well under complex and nonlinear constraints. At the end, if any wind farm considered to be off in UC, a must run constraint will make them on and calculate reliability effect of the recommitted wind farm on generation system and decrease from the capacity of the most expensive thermal units equal to the calculated effect of newly committed wind farm on system reliability. Then wind farms that recommitted will be paid 80 percent of the cheapest committed unit in that period. In this way, wind farms will be supported wisely and free power market conditions will be remain unchanged.
引用
收藏
页码:72 / 76
页数:5
相关论文
共 50 条
  • [1] A Unit Commitment for Electricity Market Participation of Wind Farms
    Abbasi, Ehsan
    Hosseini, Seyed Hamid
    Ghamsari, Mohammadreza Dorostkar
    [J]. 2017 IEEE POWER & ENERGY SOCIETY INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE (ISGT), 2017,
  • [2] Stochastic unit commitment of wind farms integrated in power system
    Siahkali, H.
    Vakilian, M.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2010, 80 (09) : 1006 - 1017
  • [3] Unit commitment in wind farms based on a glowworm metaphor algorithm
    Yan, J.
    Zhang, J.
    Liu, Y.
    Han, S.
    Li, L.
    Gu, C.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2015, 129 : 94 - 104
  • [4] Unit Commitment With Probabilistic Spinning Reserve and Interruptible Load Considerations
    Aminifar, Farrokh
    Fotuhi-Firuzabad, Mahmud
    Shahidehpour, Mohammad
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (01) : 388 - 397
  • [5] Stochastic Security Constrained Unit Commitment with High Penetration of Wind Farms
    Kia, Mohsen
    Hosseini, Seyed Hamid
    Heidari, Alireza
    Lotfi, Mohamed
    Catalao, Joao P. S.
    Shafie-khah, Miadreza
    Osorio, Gerardo
    Santos, Sergio F.
    [J]. 2019 IEEE INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING AND 2019 IEEE INDUSTRIAL AND COMMERCIAL POWER SYSTEMS EUROPE (EEEIC / I&CPS EUROPE), 2019,
  • [6] A NOVEL METAHEURISTIC APPROACH TO SOLVE UNIT COMMITMENT PROBLEM IN THE PRESENCE OF WIND FARMS
    Abasi, Mahyar
    Nezhadnaeini, Maryam Falah
    Karimi, Mohammmad
    Yousefi, Nasser
    [J]. REVUE ROUMAINE DES SCIENCES TECHNIQUES-SERIE ELECTROTECHNIQUE ET ENERGETIQUE, 2015, 60 (03): : 253 - 262
  • [7] Joint Chance Constrained Unit Commitment With Wind Farms Based on Risk Sharing
    Sun, Yan
    Chen, Yan
    Mo, Dong
    Li, Qiuwen
    Ling, Wuneng
    [J]. Dianwang Jishu/Power System Technology, 2022, 46 (08): : 2996 - 3006
  • [8] Thermal Unit Commitment with Wind Farms Using Taguchi-Immune Algorithm
    Ouedraogo, Faouzi Brice
    Liu, Wei-Liang
    Chen, Chao-Rong
    [J]. 2020 IEEE INTERNATIONAL CONFERENCE ON CONSUMER ELECTRONICS - TAIWAN (ICCE-TAIWAN), 2020,
  • [9] Fuzzy Mid Term Unit Commitment Considering Large Scale Wind Farms
    Siahkali, H.
    [J]. 2008 IEEE 2ND INTERNATIONAL POWER AND ENERGY CONFERENCE: PECON, VOLS 1-3, 2008, : 1227 - 1232
  • [10] A Comparative Study of Deterministic Unit Commitment and Probabilistic Unit Commitment
    Zhou, Gang
    Zhang, Kaifeng
    Yuan, Kun
    Li, Dawei
    Ding, Qia
    Xie, Lirong
    Wu, Shuomin
    [J]. PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY (ICREET 2016), 2017, 112 : 99 - 107