Unit Commitment With Probabilistic Spinning Reserve and Interruptible Load Considerations

被引:114
|
作者
Aminifar, Farrokh [1 ]
Fotuhi-Firuzabad, Mahmud [1 ]
Shahidehpour, Mohammad [2 ]
机构
[1] Sharif Univ Technol, Dept Elect Engn, Tehran, Iran
[2] IIT, Dept Elect & Comp Engn, Chicago, IL 60616 USA
关键词
Interruptible load; mixed-integer programming (MIP); reliability-constrained unit commitment (RCUC); spinning reserve; STOCHASTIC SECURITY; MARKET;
D O I
10.1109/TPWRS.2008.2008675
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper demonstrates how a probabilistic criterion could be explicitly integrated in the unit commitment (UC) formulation. Both spinning reserve and interruptible load are taken into account as the operating reserve facilities. Incorporating the interruption notice time of interruptible load involves some complexities in the evaluation procedure and problem formulation which is considered in this paper. The expected energy not supplied (EENS) is considered as a probabilistic criterion and a new method is proposed to calculate this index in the presence of interruptible load. The reliability-constrained unit commitment (RCUC) problem is formulated based on the mixed-integer programming (MIP) method that can be solved using large-scale commercial solvers. The effectiveness of the proposed formulation is examined using the IEEE-RTS. Numerical results are presented and the implementation issues are discussed. A number of analyses are examined to evaluate the impact of some important factors on the problem solution.
引用
收藏
页码:388 / 397
页数:10
相关论文
共 50 条
  • [1] INTERRUPTIBLE LOAD CONSIDERATIONS IN SPINNING RESERVE ASSESSMENT OF ISOLATED AND INTERCONNECTED GENERATING SYSTEMS
    CHOWDHURY, N
    BILLINTON, R
    [J]. IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1990, 137 (02) : 159 - 167
  • [2] A probabilistic reserve market incorporating interruptible load
    Bai, J.
    Gooi, H. B.
    Xia, L. M.
    Strbac, G.
    Venkatesh, B.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (03) : 1079 - 1087
  • [3] A probabilistic reserve market incorporating interruptible load
    Bai, J.
    Gooi, H. B.
    Xia, L. M.
    Strbac, G.
    Venkatesh, B.
    [J]. 2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10, 2007, : 1777 - 1777
  • [4] Optimizing probabilistic spinning reserve by an umbrella contingencies constrained unit commitment
    Wang, M. Q.
    Yang, M.
    Liu, Y.
    Han, X. S.
    Wu, Q.
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 109 : 187 - 197
  • [5] Unit commitment with probabilistic reserve
    Chattopadbyay, D
    Baldick, R
    [J]. 2002 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, 2002, : 280 - 285
  • [6] Incorporating Optimal Transmission Switching in Unit Commitment with a Probabilistic Spinning Reserve Criterion
    Valarezo, Orlando M.
    Wang, Mingqiang
    Memon, Rizwan Ahmed
    [J]. 2018 2ND IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2018,
  • [7] Spinning Reserve Optimization Based on Unit Commitment with Loss-of-load-probability Constraint
    Yang, Pengpeng
    Zhu, Chunping
    Zhao, Long
    Wang, Mingqiang
    Liu, Yuan
    Ning, Xingyao
    [J]. 2016 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2016, : 1409 - 1412
  • [8] Probabilistic spinning reserves with interruptible loads
    Xia, LA
    Gooi, HB
    Bai, J
    [J]. 2004 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1 AND 2, 2004, : 146 - 152
  • [9] Unit commitment with probabilistic reserve: An IPSO approach
    Lee, Tsung-Ying
    Chen, Chun-Lung
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2007, 48 (02) : 486 - 493
  • [10] Probabilistic unit commitment with wind farms considerations
    Hosseini, Seyed Hamid
    Abbasi, Ehsan
    [J]. 2007 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, 2007, : 72 - 76