Integrating real options into project management process of power plant construction

被引:0
|
作者
He, KJ [1 ]
Xie, C [1 ]
Chen, J [1 ]
机构
[1] Hunan Univ, Coll Business & Management, Changsha 410082, Peoples R China
关键词
management flexibility; project management; real options;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With the rapid development of technology such as computes and tele-communication technologies, product life cycle is becoming shorter and shorter. Project managers nowadays are required to adapt to changes in technology and market continuously. Now it is believed that only short term appropriate decisions that can lead to long term successful strategies. Borrowed from financial as a series of options that are exercised option theory, real option theory treats investment strategy continually to achieve both short and long term returns on investment. Management flexibility represented as option value is incorporated into traditional Discounted Cash Flow (DCF) approach to reflect more dynamic decision making process. This paper points out problems in traditional DCF approach, critically reviews real option theory, its comparison with financial options and its classification. Different from previous researches mainly concentrating on hi-h risk industries such as Information Technology (IT) industry, this paper analyzes the integration of real option method into power plant construction project. This paper discusses problems found in current power plant construction project due to lack of managerial flexibility integration so far. Then this paper proposes different real option applications in the project management process of Power Plant Construction.
引用
收藏
页码:2264 / 2271
页数:8
相关论文
共 50 条
  • [41] Integrating fuel treatment into ecosystem management: a proposed project planning process
    Stockmann, Keith D.
    Hyde, Kevin D.
    Jones, J. Greg
    Loeffler, Dan R.
    Silverstein, Robin P.
    [J]. INTERNATIONAL JOURNAL OF WILDLAND FIRE, 2010, 19 (06) : 725 - 736
  • [42] Integrating process and project management for multi-site software development
    Chan, KCC
    Chung, LML
    [J]. ANNALS OF SOFTWARE ENGINEERING, 2002, 14 (1-4) : 115 - 143
  • [43] Integrating design in the project process
    Austin, S
    Baldwin, A
    Li, B
    Waskett, P
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2000, 138 (04) : 177 - 182
  • [44] Research on the Construction of Energy Project Portfolio Management Process System
    Qiang, Ma
    [J]. AGRO FOOD INDUSTRY HI-TECH, 2017, 28 (03): : 249 - 253
  • [45] Project risk management in process of construction of hydrotechnical supply tunnel
    Gvozdenovic, Tamara
    Arsovski, Slavko
    Rajkovic, Dragan
    Milojevic, Zoran
    Pravdic, Predrag
    [J]. TECHNICS TECHNOLOGIES EDUCATION MANAGEMENT-TTEM, 2012, 7 (01): : 11 - 17
  • [46] PROJECT PARTNERING + NEW MANAGEMENT STRATEGY STREAMLINES THE CONSTRUCTION PROCESS
    DORRIS, VK
    [J]. ARCHITECTURE-THE AIA JOURNAL, 1993, 82 (10): : 111 - 113
  • [47] The Project Management Process of Planning and Budgeting in Public Construction Projects
    Larsen, Jesper Kranker
    Ussing, Lene Faber
    Brunoe, Thomas Ditlev
    Lindhard, Soren Munch
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (04) : 20 - 33
  • [48] Study of dependencies in a risk management process: case of a construction project
    Lmoussaoui, Hafida
    Jamouli, Hicham
    [J]. PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 112 - 117
  • [49] Evaluating the value IT adds to the process of project information management in construction
    Stewart, RA
    Mohamed, S
    [J]. AUTOMATION IN CONSTRUCTION, 2003, 12 (04) : 407 - 417
  • [50] Information Integration of Engineering Construction Project Based on Management Process
    Bo, Cui
    [J]. PROCEEDINGS OF THE 2015 4TH NATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS AND COMPUTER ENGINEERING ( NCEECE 2015), 2016, 47 : 1135 - 1140