An Interval-parameter Multi-stage Stochastic Chance-constrained Mixed Integer Programming Model for Inter-basin Water Resources Management Systems under Uncertainty

被引:6
|
作者
Han, Y. C. [1 ]
Huang, G. H. [2 ]
Li, C. H. [1 ]
机构
[1] Beijing Normal Univ, Sch Environm, State Key Lab Water Environm Simulat, Beijing 100875, Peoples R China
[2] Univ Regina, Fac Engn, Regina, SK S4S 0A2, Canada
关键词
Decision making; Environment; Inexact optimization; Multistage; Uncertainty; Water resources;
D O I
10.1109/FSKD.2008.465
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this study, an interval-parameter multi-stage stochastic chance-constrained mixed integer programming (IMSCMIP) method has been developed for inter-basin water resources management systems under uncertainty. By incorporating the chance-constrained programming (CCP) techniques, and mixed integer programming within an interval-parameter multi-stage stochastic programming framework, the model improves upon the interval-parameter multi-stage stochastic programming (IMSP) and can deal with uncertainties expressed as not only possibility and probabilities distributions but also as discrete intervals, and can incorporate pre-defined water policies directly into its optimization process. A multilayer scenario tree is used to tackle the uncertainties expressed as probability distributions and discrete intervals in IMSCMIP.
引用
收藏
页码:146 / +
页数:3
相关论文
共 50 条
  • [1] An interval-parameter multi-stage stochastic programming model for water resources management under uncertainty
    Li, YP
    Huang, GH
    Nie, SL
    [J]. ADVANCES IN WATER RESOURCES, 2006, 29 (05) : 776 - 789
  • [2] An interval-parameter chance-constrained dynamic programming approach for capacity planning under uncertainty
    Dai, C.
    Li, Y. P.
    Huang, G. H.
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2012, 62 : 37 - 50
  • [3] An inexact multi-stage interval-parameter partial information programming model for water resources management under uncertainties
    Chen, Hongguang
    Wang, Zhongjun
    [J]. WATER SUPPLY, 2021, 21 (05) : 2139 - 2157
  • [4] Interval-parameter two-stage stochastic nonlinear programming for water resources management under uncertainty
    Li, Yong P.
    Huang, Guo H.
    [J]. WATER RESOURCES MANAGEMENT, 2008, 22 (06) : 681 - 698
  • [5] Interval-parameter Two-stage Stochastic Nonlinear Programming for Water Resources Management under Uncertainty
    Yong P. Li
    Guo H. Huang
    [J]. Water Resources Management, 2008, 22 : 681 - 698
  • [6] An interval-parameter two-stage stochastic integer programming model for environmental systems planning under uncertainty
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    Nie, X. H.
    Maqsood, I.
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (04) : 461 - 483
  • [7] An Interval-Parameter Fuzzy Linear Programming with Stochastic Vertices Model for Water Resources Management under Uncertainty
    Han, Yan
    Huang, Yuefei
    Jia, Shaofeng
    Liu, Jiahong
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [8] The interval copula-measure Me based multi-objective multi-stage stochastic chance-constrained programming for seasonal water resources allocation under uncertainty
    Youzhi Wang
    Ping Guo
    [J]. Stochastic Environmental Research and Risk Assessment, 2021, 35 : 1463 - 1480
  • [9] The interval copula-measure Me based multi-objective multi-stage stochastic chance-constrained programming for seasonal water resources allocation under uncertainty
    Wang, Youzhi
    Guo, Ping
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2021, 35 (07) : 1463 - 1480
  • [10] An Interval-Parameter Chance-Constraint Mixed-Integer Programming for Energy Systems Planning Under Uncertainty
    Huang, G. H.
    Niu, Y. T.
    Lin, Q. G.
    Zhang, X. X.
    Yang, Y. P.
    [J]. ENERGY SOURCES PART B-ECONOMICS PLANNING AND POLICY, 2011, 6 (02) : 192 - 205