Accounting for Network Effects in Railway Asset Management

被引:25
|
作者
Furuya, Akitoshi [1 ]
Madanat, Samer [1 ]
机构
[1] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
关键词
Infrastructure; Maintenance; Optimization; System management; Rail transportation; Economic factors; Interactive systems; Heterogeneity; MAINTENANCE; SYSTEM; MODEL; OPTIMIZATION; INSPECTION; DECISIONS; POLICIES;
D O I
10.1061/(ASCE)TE.1943-5436.0000477
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
System-level infrastructure management involves determining optimal maintenance, rehabilitation, and reconstruction activities for a system of facilities over a planning horizon to maximize the level of service subject to system constraints. In railway networks, different types of facilities (such as tracks, and bridges) comprise the system, and maintenance of one facility may affect the maintenance of other facilities, both economically and functionally. Therefore, when developing an asset management system for railway networks, it is essential to take into account heterogeneity and interdependency in the network. In this paper, a two-stage, bottom-up methodology is formulated to capture these interdependencies and heterogeneities in railroad infrastructure management. Numerical experiments are presented to examine the effects of economic and functional interdependencies on network optimization and to demonstrate the validity of the proposed model. The results show that accounting for heterogeneity and interdependencies at the system level can greatly influence the choice of activities and the estimated life-cycle cost. DOI: 10.1061/(ASCE)TE.1943-5436.0000477. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:92 / 100
页数:9
相关论文
共 50 条
  • [11] Requirements for Big Data adoption for Railway asset Management
    McMahon P.
    Zhang T.
    Dwight R.
    [J]. IEEE Access, 2020, 8 : 15543 - 15564
  • [12] Requirements for Big Data Adoption for Railway Asset Management
    Mcmahon, P.
    Zhang, T.
    Dwight, R.
    [J]. IEEE ACCESS, 2020, 8 : 15543 - 15564
  • [13] Quantifying the impact of variability in railway bridge asset management
    Yianni, P. C.
    Neves, L. C.
    Rama, D.
    Andrews, J. D.
    Tedstone, N.
    Dean, R.
    [J]. LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 1395 - 1402
  • [14] Towards an asset management system for railway embankments and cuttings
    Sloan, A
    Garland, RJ
    Lloyd, JA
    [J]. RAILWAY INFRASTRUCTURE, 2001, 2001 (03): : 201 - 211
  • [15] Digitalization and Dynamic Criticality Analysis for Railway Asset Management
    Hernández, Mauricio Rodríguez
    Sánchez-Herguedas, Antonio
    González-Prida, Vicente
    Contreras, Sebastián Soto
    Crespo Márquez, Adolfo
    [J]. Applied Sciences (Switzerland), 2024, 14 (22):
  • [16] A holistic modelling framework for railway infrastructure asset management
    Rama, D.
    Andrews, J. D.
    [J]. SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 687 - 695
  • [17] Approaches to Dealing With Missing Data in Railway Asset Management
    McMahon, Paul
    Zhang, Tieling
    Dwight, Richard A.
    [J]. IEEE ACCESS, 2020, 8 : 48177 - 48194
  • [18] DEVOLUTION, ACCRUALS ACCOUNTING AND ASSET MANAGEMENT IN NHS WALES
    Mellett, Howard
    Marriott, Neil
    Macniven, Louise
    [J]. FINANCIAL ACCOUNTABILITY & MANAGEMENT, 2009, 25 (04) : 435 - 450
  • [19] Asset Accounting
    Meyer, Harvey G.
    [J]. ACCOUNTING REVIEW, 1952, 27 (04): : 569 - 570
  • [20] An alternative approach to railway asset management value analysis: application to a UK railway corridor
    Litherland, Jack
    Calvert, Gareth
    Andrews, John
    Modhara, Sunny
    Kirwan, Andy
    [J]. INFRASTRUCTURE ASSET MANAGEMENT, 2021, 8 (02) : 85 - 97