PRODUCTION SCHEDULING FOR PARALLEL MACHINES USING SIMULATION TECHNIQUES: CASE STUDY OF PLASTIC PACKAGING FACTORY

被引:0
|
作者
Panasri, Jiratsaya [1 ]
Samattapapong, Nara [1 ]
Sangthong, Sathitthep [1 ]
机构
[1] Suranaree Univ Technol, Dept Ind Engn, 111 Univ Rd, Nakhon Ratchasima 30000, Thailand
关键词
D O I
10.1109/WSC57314.2022.10015428
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
The purpose of this study is to use simulation techniques to examine the production scheduling process for parallel machines. This examination focuses on improving the work sequence in the machine and making the most cost-effective use of raw materials, as well as delivering goods on time to customers and reducing total uptime. After examining and collecting data on the planning and sequencing operations, it was discovered that there was a problem in determining how to assign work to the machines due to a lack of systematic analysis of production scheduling, so scheduling systems and tools cannot tell if the current sequence is the best one. The researchers then used simulation techniques to create all possible alternatives and identify the best solution for the sequencing process on the machine. The simulation results showed that sequencing using simulation techniques can reduce the total working time to 112,831.99 seconds by 54%.
引用
收藏
页码:1876 / 1887
页数:12
相关论文
共 50 条
  • [21] A production scheduling system for parallel machines in an electrical appliance plant
    Gao, L
    Wang, CY
    Wang, DW
    Yin, ZS
    Wang, SN
    COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) : 105 - 108
  • [22] Parallel techniques in irregular codes:: cloth simulation as case of study
    Gutiérrez, E
    Romero, S
    Romero, LF
    Plata, O
    Zapata, EL
    JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2005, 65 (04) : 424 - 436
  • [23] Uniform Parallel Machines Scheduling using a Genetic Algorithm
    Mihaila, Alin
    Mihaila, Cristina
    ISDA 2008: EIGHTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND APPLICATIONS, VOL 2, PROCEEDINGS, 2008, : 401 - 406
  • [24] A virtual factory based approach to on-line simulation and scheduling for an FMS and a case study
    Ming-Hung Lin
    Li-Chen Fu
    Journal of Intelligent Manufacturing, 2001, 12 : 269 - 279
  • [25] A virtual factory based approach to on-line simulation and scheduling for an FMS and a case study
    Lin, MH
    Fu, LC
    JOURNAL OF INTELLIGENT MANUFACTURING, 2001, 12 (03) : 269 - 279
  • [26] Graph Balancing: A Special Case of Scheduling Unrelated Parallel Machines
    Ebenlendr, Tomas
    Krcal, Marek
    Sgall, Jiri
    ALGORITHMICA, 2014, 68 (01) : 62 - 80
  • [27] Scheduling two parallel machines with a single server: the general case
    Abdekhodaee, AH
    Wirth, A
    Gan, HS
    COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (04) : 994 - 1009
  • [28] Graph Balancing: A Special Case of Scheduling Unrelated Parallel Machines
    Tomáš Ebenlendr
    Marek Krčál
    Jiří Sgall
    Algorithmica, 2014, 68 : 62 - 80
  • [29] Graph Balancing: A Special Case of Scheduling Unrelated Parallel Machines
    Ebenlendr, Tomas
    Krcal, Marek
    Sgall, Jiri
    PROCEEDINGS OF THE NINETEENTH ANNUAL ACM-SIAM SYMPOSIUM ON DISCRETE ALGORITHMS, 2008, : 483 - 490
  • [30] Scheduling optimization for production of prefabricated components with parallel work of serial machines
    Liu, Wenli
    Tao, Xingyu
    Mao, Chao
    He, Wenjian
    AUTOMATION IN CONSTRUCTION, 2023, 148