共 39 条
- [2] Feeder-switch relocation based upon risk analysis of trees-caused interruption and value-based distribution reliability assessment [J]. TENCON 2004 - 2004 IEEE REGION 10 CONFERENCE, VOLS A-D, PROCEEDINGS: ANALOG AND DIGITAL TECHNIQUES IN ELECTRICAL ENGINEERING, 2004, : C577 - C580
- [3] Optimal switching placement for customer interruption cost minimization [J]. 2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 312 - +
- [4] Evaluation of an Event Based Customer Interruption Cost for Distribution Feeder [J]. 2013 INTERNATIONAL CONFERENCE ON EMERGING TRENDS IN COMMUNICATION, CONTROL, SIGNAL PROCESSING AND COMPUTING APPLICATIONS (IEEE-C2SPCA-2013), 2013,
- [5] Customer Interruption Cost Minimization Based on Graph Theory in Smart Distribution Grid [J]. 2013 SMART GRID CONFERENCE (SGC'13), 2013, : 47 - 52
- [6] Study on the algorithm for the reasonable switch automation rate with customer interruption cost and reliability evaluation [J]. Kim, J.-C. (jckim@ssu.ac.kr), 1600, Korean Institute of Electrical Engineers (62):
- [7] Customer Interruption Cost in Smart Grids [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (02) : 994 - 995
- [8] Customer interruption cost assessment of domestic residential customer using customer survey [J]. Transactions of the Korean Institute of Electrical Engineers, 2010, 59 (10): : 1792 - 1796
- [9] Impact of distributed generation resources on customer interruption cost [J]. 2004 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY - POWERCON, VOLS 1 AND 2, 2004, : 856 - 861
- [10] Customer interruption cost assessment: an Indian commercial survey [J]. POWERCON 2002: INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY, VOLS 1-4, PROCEEDINGS, 2002, : 880 - 884