Multi-period job selection: planning work loads to maximize profit

被引:58
|
作者
Lewis, HF
Slotnick, SA
机构
[1] Arizona State Univ W, Sch Management, Phoenix, AZ 85069 USA
[2] SUNY Stony Brook, W Averell Harriman Sch Management & Policy, Stony Brook, NY 11794 USA
关键词
selection; scheduling; heuristics; dynamic programming;
D O I
10.1016/S0305-0548(00)00105-2
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We examine the profitability of job selection decisions over a number of periods when current orders exceed capacity with the objective of maximizing profit (per-job revenue net of processing costs, minus weighted lateness costs), and when rejecting a job will result in no future jobs from that customer. First we present an optimal dynamic programming algorithm, taking advantage of the structure of the problem to reduce the computational burden. Next we develop a number of myopic heuristics and run computational tests using the DP as benchmark for small problems and the best heuristic as benchmark for larger problems. We find one heuristic that produces near-optimal results for small problems, is tractable for larger problems, and requires the same information as the dynamic program (current and future orders), and another that produces good results using historical information. Our results have implications for when it is more or less worthwhile to expend resources to maintain past records and obtain future information about orders.
引用
收藏
页码:1081 / 1098
页数:18
相关论文
共 50 条
  • [21] Sustainable multi-period electricity planning for Iskandar Malaysia
    Zarina Ab Muis
    Wai Shin Ho
    Haslenda Hashim
    Ming Yang Lee
    Ahmad Fakrul Ramli
    [J]. Clean Technologies and Environmental Policy, 2016, 18 : 2467 - 2478
  • [22] Procurement planning in a multi-period supply chain: An epiphany
    Nielsen, Izabela Ewa
    Saha, Subrata
    [J]. OPERATIONS RESEARCH PERSPECTIVES, 2018, 5 : 383 - 398
  • [23] Multi-period yard template planning in container terminals
    Zhen, Lu
    Xu, Zhou
    Wang, Kai
    Ding, Yi
    [J]. TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2016, 93 : 700 - 719
  • [24] Multi-Period Planning With Actual Physical and Traffic Conditions
    Soumplis, P.
    Christodoulopoulos, K.
    Quagliotti, M.
    Pagano, A.
    Varvarigos, E.
    [J]. JOURNAL OF OPTICAL COMMUNICATIONS AND NETWORKING, 2018, 10 (01) : A144 - A153
  • [25] TRANSPORT FLEET PLANNING FOR MULTI-PERIOD OPERATIONS.
    New, Christopher Colin
    [J]. Operational Research Quarterly, 1975, 26 (1 ii): : 151 - 166
  • [26] Multi-period Planning of Road Trips in a Cooperative Environment
    Calore, G.
    Caballini, C.
    Sacone, S.
    Siri, S.
    [J]. 2017 IEEE 20TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2017,
  • [27] Sustainable multi-period electricity planning for Iskandar Malaysia
    Ab Muis, Zarina
    Ho, Wai Shin
    Hashim, Haslenda
    Lee, Ming Yang
    Ramli, Ahmad Fakrul
    [J]. CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2016, 18 (08) : 2467 - 2478
  • [28] Multi-period portfolio selection model with transaction cost
    Cai Jun
    Meng Xiaolian
    [J]. PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE AND HIGHER EDUCATION, 2015, 28 : 355 - 360
  • [29] A multi-period dynamic model for optimal Portfolio Selection
    Yang, GL
    Huang, SM
    Cao, J
    [J]. MANAGEMENT SCIENCES AND GLOBAL STRATEGIES IN THE 21ST CENTURY, VOLS 1 AND 2, 2004, : 29 - 33
  • [30] Integrated projects planning in IS departments: A multi-period multi-project selection and assignment approach with a computerized implementation
    Chen, Chung-Yang
    Liu, Heng-An
    Song, Je-Yi
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 229 (03) : 683 - 694