The Status of the Thirty Meter Telescope Project

被引:77
|
作者
Nelson, Jerry [1 ]
Sanders, Gary H. [2 ]
机构
[1] Univ Calif Santa Cruz, Santa Cruz, CA 95064 USA
[2] TMT project, Pasadena, CA 91107 USA
基金
加拿大创新基金会; 美国国家科学基金会;
关键词
TMT; telescope; project; status; thirty-meter;
D O I
10.1117/12.788238
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
The Thirty Meter Telescope (TMT) Project will design and build a thirty-meter diameter telescope for research in astronomy at optical and infrared wavelengths. TMT is a partnership between the University of California, Caltech, and the Association of Canadian Universities for Research in Astronomy (ACURA). The $80 million TMT design and development phase is fully funded and Preliminary Design is in progress. An additional $300 million has been pledged towards early TMT construction which will commence in 2009. We include a high level description of the design of the telescope and its planned adaptive optics and science instrumentation. The schedule of key milestones for completing the design and construction is summarized.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Reliability Estimate for the Thirty Meter Telescope
    Rogers, John
    Fordham, Bart
    Trancho, Gelys
    Khodabakhsh, Hessam
    Thede, Frank
    Roberts, Scott
    MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY X, 2022, 12187
  • [22] The Alignment and Phasing System for the Thirty Meter Telescope: Risk Mitigation and Status Update
    Troy, Mitchell
    Chanan, Gary
    Michaels, Scott
    Dekens, Frank
    Hein, Randy
    Herzig, Sebastian
    Karban, Robert
    Nissly, Carl
    Roberts, Jennifer
    Rud, Michael
    Seo, Byoung-Joon
    GROUND-BASED AND AIRBORNE TELESCOPES VI, 2016, 9906
  • [23] Extreme adaptive optics for the thirty meter telescope
    Macintosh, Bruce
    Troy, Mitchell
    Doyon, Rene
    Graham, James
    Baker, Kevin
    Bauman, Brian
    Marois, Christian
    Palmer, David
    Phillion, Donald
    Poyneer, Lisa
    Crossfield, Ian
    Dumont, Philip
    Levine, B. Marty
    Shao, Michael
    Serabyn, Gene
    Shelton, Chris
    Vasisht, Gautum
    Wallace, James K.
    Lavigne, Jean-Francois
    Valee, Philippe
    Rowlands, Neil
    Tam, Ken
    Hackett, Daniel
    ADVANCES IN ADAPTIVE OPTICS II, PRS 1-3, 2006, 6272 : U219 - U233
  • [24] The alignment and phasing system for the Thirty Meter Telescope
    Chanan, Gary
    Troy, Mitchell
    Crossfield, Ian
    Nelson, Jerry
    Mast, Terry
    GROUND-BASED AND AIRBORNE TELESCOPES, PTS 1 AND 2, 2006, 6267
  • [25] Thirty Meter Telescope Cost Estimating Process
    Oram, Jeffrey
    Goodman, David
    Sanders, Gary
    MODELLING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY III, 2008, 7017
  • [26] Conceptual design of enclosure for Thirty Meter Telescope
    Loewen, N.
    Brzezik, W.
    Fitzsimmons, J.
    Halliday, D. J.
    Sun, S.
    Vasiljevic, A.
    GROUND-BASED AND AIRBORNE TELESCOPES, PTS 1 AND 2, 2006, 6267
  • [27] Judge approves Thirty Meter Telescope construction
    Banks, Michael
    PHYSICS WORLD, 2017, 30 (09) : 10 - 10
  • [28] NFIRAOS adaptive optics for the Thirty Meter Telescope
    Crane, Jeffrey
    Herriot, Glen
    Andersen, David
    Atwood, Jenny
    Byrnes, Peter
    Densmore, Adam
    Dunn, Jennifer
    Fitzsimmons, Joeleff
    Hardy, Tim
    Hoff, Brian
    Jackson, Kate
    Kerley, Dan
    Lardiere, Olivier
    Smith, Malcolm
    Stocks, Jonathan
    Veran, Jean-Pierre
    Boyer, Corinne
    Wang, Lianqi
    Trancho, Gelys
    Trubey, Melissa
    ADAPTIVE OPTICS SYSTEMS VI, 2018, 10703
  • [29] Solar System Capabilities of the Thirty Meter Telescope
    David Crampton
    Luc Simard
    Earth, Moon, and Planets, 2009, 105 : 65 - 72
  • [30] The thirty meter telescope site testing system
    Skidmore, W
    Schöck, M
    Tokovinin, A
    Djorgovski, G
    Walker, A
    Blum, R
    Travouillon, T
    Seguel, J
    Bustos, E
    Walker, D
    Vasquez, J
    Gillett, P
    GROUND-BASED TELESCOPES, PTS 1 AND 2, 2004, 5489 : 154 - 164