MORSA: A Multi-objective Resource Scheduling Algorithm for NFV Infrastructure

被引:0
|
作者
Yoshida, M. [1 ]
Shen, W. [1 ]
Kawabata, T. [1 ]
Minato, K. [1 ]
Imajuku, W. [1 ]
机构
[1] NTT Network Innovat Labs, 1-1 Hikari No Oka, Yokosuka, Kanagawa 2390847, Japan
关键词
NFV-MANO; NFV-Orchestrator; OpenStack; Resource Scheduling; Genetic Algorithm;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Capital expenditure (CAPEX) and operating expenses (OPEX) have been practical concerns for telecommunication companies, and Network Function Virtualization (NFV) has attracted significant attention in recent years. However, the NFV Infrastructure (NFVI) includes a wide variety of resource types and stakeholders. Hence, there is still a need for the existing resource scheduling approaches, but they are no longer sufficient. In this paper, we propose a Multi-objective Resource Scheduling Algorithm (MORSA) to optimize the NFVI resources. In the development of the MORSA, we designed a plug-in architecture to satisfy various requirements related to NFVI resources and stakeholder policies. The MORSA allows the NFVI Resource Scheduler to optimize simultaneously the combination of possibly conflicting objectives with multifaceted constraints in complex real world situations. Evaluation results show that the MORSA obtains approximate solutions among conflicting objectives in a reasonable computation time.
引用
收藏
页数:6
相关论文
共 50 条
  • [31] Scheduling scientific workflow using multi-objective algorithm with fuzzy resource utilization in multi-cloud environment
    Farid, Mazen
    Latip, Rohaya
    Hussin, Masnida
    Abdul Hamid, Nor Asilah Wati
    [J]. IEEE Access, 2020, 8 : 24309 - 24322
  • [32] Application of multi-objective memetic algorithm in multi-objective flexible job-shop scheduling problem
    Zhenwen, H.U.
    [J]. Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 24 - 28
  • [33] RETRACTED: MCAMO: multi constraint aware multi-objective resource scheduling optimization technique for cloud infrastructure services (Retracted Article)
    Ramamoorthy, S.
    Ravikumar, G.
    Balaji, B. Saravana
    Balakrishnan, S.
    Venkatachalam, K.
    [J]. JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2021, 12 (06) : 5909 - 5916
  • [34] Multi-objective genetic algorithm and its applications to flowshop scheduling
    Murata, T
    Ishibuchi, H
    Tanaka, H
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 30 (04) : 957 - 968
  • [35] A robust scheduling method based on a multi-objective immune algorithm
    Zuo, Xingquan
    Mo, Hongwei
    Wu, Jianping
    [J]. INFORMATION SCIENCES, 2009, 179 (19) : 3359 - 3369
  • [36] A multi-objective memetic algorithm for integrated process planning and scheduling
    Jin, Liangliang
    Zhang, Chaoyong
    Shao, Xinyu
    Yang, Xudong
    Tian, Guangdong
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 85 (5-8): : 1513 - 1528
  • [37] A hybrid algorithm for multi-objective job shop scheduling problem
    Li, Junqing
    Pan, Quanke
    Xie, Shengxian
    Gao, Kaizhou
    Wang, Yuting
    [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3630 - 3634
  • [38] EFFICIENT MULTI-OBJECTIVE EVOLUTIONARY ALGORITHM FOR JOB SHOP SCHEDULING
    Lei Deming Wu Zhiming Institute of Automation
    [J]. Chinese Journal of Mechanical Engineering, 2005, (04) : 494 - 497
  • [39] A Multi-objective Genetic Algorithm for the Software Project Scheduling Problem
    Garcia-Najera, Abel
    del Carmen Gomez-Fuentes, Maria
    [J]. NATURE-INSPIRED COMPUTATION AND MACHINE LEARNING, PT II, 2014, 8857 : 13 - 24
  • [40] A Multi-objective PSO Algorithm for Energy-efficient Scheduling
    Yang, Tianqi
    [J]. SMART MATERIALS AND INTELLIGENT SYSTEMS, PTS 1 AND 2, 2011, 143-144 : 663 - 667