共 50 条
- [31] A Multi-Objective Variable Neighborhood Search Algorithm for Precast Production Scheduling [J]. ENGINEERING JOURNAL-THAILAND, 2020, 24 (06): : 139 - 157
- [32] DAG Scheduling Using a Lookahead Variant of the Heterogeneous Earliest Finish Time Algorithm [J]. PROCEEDINGS OF THE 18TH EUROMICRO CONFERENCE ON PARALLEL, DISTRIBUTED AND NETWORK-BASED PROCESSING, 2010, : 27 - 34
- [34] Optimization of a molten iron scheduling problem with uncertain processing time using variable neighborhood search algorithm [J]. Scientific Reports, 12
- [36] Variable Neighborhood Search for Integrated Planning and Scheduling [J]. COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2017, PT II, 2017, 10405 : 709 - 724
- [37] A de-centralized scheduling and load balancing algorithm for heterogeneous grid environments [J]. 2002 INTERNATIONAL CONFERENCE ON PARALLEL PROCESSING, PROCEEDINGS OF THE WORKSHOPS, 2002, : 499 - 505
- [38] Session Scheduling Algorithm of Grid Computing [J]. THIRD INTERNATIONAL CONFERENCE ON KNOWLEDGE DISCOVERY AND DATA MINING: WKDD 2010, PROCEEDINGS, 2010, : 3 - 6
- [39] Capacity planning and scheduling in Grid computing environments [J]. FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2008, 24 (05): : 404 - 414
- [40] A task scheduling method in grid computing environments [J]. IMECS 2007: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2007, : 904 - +