共 50 条
- [41] Joint Optimization of the Production Scheduling, Maintenance Activities, and Inventory Level for a Degrading Flexible Job-Shop Manufacturing System [J]. 67TH ANNUAL RELIABILITY & MAINTAINABILITY SYMPOSIUM (RAMS 2021), 2021,
- [43] Solving Fuzzy Job-Shop Scheduling Problems with a Multiobjective Optimizer [J]. KNOWLEDGE AND SYSTEMS ENGINEERING (KSE 2013), VOL 2, 2014, 245 : 197 - 209
- [44] New scheduling type applied to solving job-shop scheduling problem [J]. Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2008, 44 (10): : 24 - 31
- [45] Flexible job-shop fuzzy scheduling based on fuzzy delivery deadline [J]. Academic Journal of Manufacturing Engineering, 2019, 17 (01): : 51 - 56
- [46] Solving nonstandard job-shop scheduling problem by efficient scheduling algorithm [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2001, 7 (07): : 12 - 15
- [47] Solving the Multi-objective Flexible Job-Shop Scheduling Problem with Alternative Recipes for a Chemical Production Process [J]. APPLICATIONS OF EVOLUTIONARY COMPUTATION, EVOAPPLICATIONS 2019, 2019, 11454 : 33 - 48
- [49] An improved artificial bee colony algorithm for fuzzy flexible job-shop scheduling problem [J]. Gong, Wen-Yin (wygong@cug.edu.cn), 1600, South China University of Technology (37): : 1284 - 1292
- [50] Parameter Optimization in GA for Job-Shop Scheduling Problem [J]. 2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 3801 - 3806