A GA with heuristic based decoder for floorplanning with flexible IC modules

被引:0
|
作者
Hwee, GB [1 ]
Hiot, LM [1 ]
机构
[1] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore 639798, Singapore
关键词
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
A genetic algorithm with heuristic based layout decoder (GAHD) is implemented for IC floorplanning. The basic idea is to make use of a GA to search for an optimal arrangement of circuit modules on a given layout area. To achieve a GA that is efficient in floorplanning, we employ a technique to systematically determine suitable weighting coefficients of the search objectives in deriving a suitable objective function. Furthermore, a heuristic based layout decoder was designed for determining the optimal aspect ratio and orientation of each flexible module. Our results show improvement over other reported floorplanning algorithms based on simulations of the AMI33 benchmark problem.
引用
收藏
页码:451 / 454
页数:4
相关论文
共 50 条
  • [41] Activity based high level modeling of dynamic switching currents in digital IC modules
    Gstoettner, Andreas
    Steinecke, Thomas
    Huemer, Mario
    2006 17TH INTERNATIONAL ZURICH SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY, VOLS 1 AND 2, 2006, : 598 - +
  • [42] Space-Cube: A flexible computer architecture based on stacked modules
    Bolotin, G
    1996 IEEE MULTI-CHIP MODULE CONFERENCE, PROCEEDINGS, 1996, : 20 - 25
  • [43] A Flexible FPGA-Based Stochastic Decoder for 5G LDPC Codes
    Tera, Sivarama Prasad
    Alantattil, Rajesh
    Paily, Roy
    Barkalov, Alexander
    ELECTRONICS, 2023, 12 (24)
  • [44] Petri net based modeling and GA based scheduling for a flexible manufacturing system
    Chung, YY
    Fu, LC
    Lin, MW
    PROCEEDINGS OF THE 37TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1998, : 4346 - 4347
  • [45] A heuristic gupta-based flexible flow-shop scheduling algorithm
    Hong, TP
    Wang, CL
    Wang, SL
    SMC 2000 CONFERENCE PROCEEDINGS: 2000 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOL 1-5, 2000, : 319 - 322
  • [46] Petri net based modeling and GA based scheduling for a flexible manufacturing system
    Natl Taiwan Univ, Taipei, Taiwan
    Proc IEEE Conf Decis Control, (4346-4347):
  • [47] Scheduling of flexible manufacturing systems based on Petri nets and hybrid heuristic search
    Huang, B.
    Sun, Y.
    Sun, Y. M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (16) : 4553 - 4565
  • [48] Scheduling flexible manufacturing system based on timed petri net and heuristic search
    Li, Cheng
    Li, Shuang
    Feng, Yi-Ping
    Rong, Gang
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2015, 49 (05): : 708 - 713
  • [49] Heuristic Gupta-based flexible flow-shop scheduling algorithm
    I-Shou Univ, Kaohsiung, Taiwan
    Proc IEEE Int Conf Syst Man Cybern, 1600, (319-322):
  • [50] Robust facility layout design for flexible manufacturing: a doe-based heuristic
    Pourvaziri, Hani
    Salimpour, Saeideh
    Niaki, Seyed Taghi Akhavan
    Azab, Ahmed
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2022, 60 (18) : 5633 - 5654