Multi-objective energy-saving scheduling for a permutation flow line

被引:15
|
作者
Li, Shunjiang [1 ]
Liu, Fei [1 ]
Zhou, Xiaona [1 ]
机构
[1] Chongqing Univ, State Key Lab Mech Transmiss, Chongqing 400030, Peoples R China
基金
高等学校博士学科点专项科研基金; 中国国家自然科学基金;
关键词
Permutation flow line scheduling; energy saving; multi-objective optimization; fixed energy consumption; non-dominated sorting genetic algorithm II; POWER-CONSUMPTION; GENETIC ALGORITHMS; CARBON FOOTPRINT; OPTIMIZATION; EFFICIENCY; REDUCTION; MINIMIZE; SYSTEM;
D O I
10.1177/0954405416657583
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, manufacturing enterprises, as larger energy consumers, face the severe environmental challenge and the mission of reducing energy consumption. Therefore, how to reduce energy consumption becomes a burning issue for manufacturing. Production scheduling provides a feasible scheme for energy saving on the system level. However, the existing researches of energy-saving scheduling rarely focus on the permutation flow line scheduling problem. This article proposes an energy-saving method for permutation flow line scheduling problem. First, a mathematical model for the permutation flow line scheduling problem is developed based on the principle of multiple energy source system of the computer numerical control machine tool. The optimization objective of this model is to simultaneously minimize the total flowtime and the fixed energy consumption. Since permutation flow line scheduling problem is a well-known NP-hard problem, the non-dominated sorting genetic algorithm II is adopted to solve the multi-objective permutation flow line scheduling problem. Finally, the effectiveness of this method is verified by numerical illustration. The computation results show that a significant trade-off between total flowtime and fixed energy consumption for the permutation flow line scheduling problem, and there would be potential for saving energy consumption by using the proposed method.
引用
下载
收藏
页码:879 / 888
页数:10
相关论文
共 50 条
  • [41] Multi-objective optimal scheduling of laminar cooling water supply system for hot rolling mills driven by digital twin for energy-saving
    Wang, Fenjia
    Song, Yong
    Liu, Chao
    He, Anrui
    Qiang, Yi
    JOURNAL OF PROCESS CONTROL, 2023, 122 : 134 - 146
  • [42] Energy consumption calculation and energy-saving measures of substation based on Multi-objective artificial bee colony algorithm
    Zhao, Na
    Wang, Jicheng
    Ding, Yuxian
    Li, Yifeng
    INTERNATIONAL JOURNAL OF EMERGING ELECTRIC POWER SYSTEMS, 2024, 25 (01) : 25 - 34
  • [43] An energy-efficient multi-objective permutation flow shop scheduling problem using an improved hybrid cuckoo search algorithm
    Gu, Wenbin
    Li, Zhuo
    Dai, Min
    Yuan, Minghai
    ADVANCES IN MECHANICAL ENGINEERING, 2021, 13 (06)
  • [44] Solving multi-objective permutation flowshop scheduling problem using CUDA
    Zelazny, Dominik
    Pempera, Jaroslaw
    2015 20TH INTERNATIONAL CONFERENCE ON METHODS AND MODELS IN AUTOMATION AND ROBOTICS (MMAR), 2015, : 347 - 352
  • [45] A discrete differential evolution algorithm for multi-objective permutation flowshop scheduling
    Baioletti, Marco
    Milani, Alfredo
    Santucci, Valentino
    INTELLIGENZA ARTIFICIALE, 2016, 10 (02) : 81 - 95
  • [46] Multi-objective simulating annealing for permutation flow shop problems
    Mokotoff, E.
    Perez, J.
    NUMERICAL ANALYSIS AND APPLIED MATHEMATICS, 2007, 936 : 368 - +
  • [47] Multi-objective distributed reentrant permutation flow shop scheduling with sequence-dependent setup time
    Rifai, Achmad Pratama
    Mara, Setyo Tri Windras
    Sudiarso, Andi
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 183
  • [48] On-time and energy-saving train operation strategy based on improved AGA multi-objective optimization
    He, Jing
    Qiao, Duo
    Zhang, Changfan
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2024, 238 (05) : 511 - 519
  • [49] A novel fuzzy model for multi-objective permutation flow shop scheduling problem with fuzzy processing time
    Yuan, Fuyu
    Xu, Xin
    Yin, Minghao
    ADVANCES IN MECHANICAL ENGINEERING, 2019, 11 (04)
  • [50] Multi-objective flexible flow shop batch scheduling problem with renewable energy
    Wu, Xiuli
    Xiao, Xiao
    Cui, Qi
    INTERNATIONAL JOURNAL OF AUTOMATION AND CONTROL, 2020, 14 (5-6) : 519 - 553