Hybrid approach to production scheduling using genetic algorithm and simulation

被引:29
|
作者
Jeong, SJ [1 ]
Lim, SJ [1 ]
Kim, KS [1 ]
机构
[1] Yonsei Univ, Dept Ind Syst Engn, Seoul 120749, South Korea
关键词
genetic algorithm; hybrid approach; production scheduling; simulation;
D O I
10.1007/s00170-004-2345-7
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the production scheduling problem, due to various kinds of uncertain factors such as queuing, breakdowns and repairing time of machines, the optimal solution considering the stochastic behaviour of a real operation cannot be easily solved. To solve the problem, we present a hybrid approach with a genetic algorithm (GA) and a simulation. The GA is used for optimization of schedules, and the simulation is used to minimize the maximum completion time for the last job with fixed schedules from the GA model. We obtain more realistic production schedules with an optimal completion time reflecting stochastic characteristics by performing the iterative hybrid GA - simulation procedure. It has been shown that the hybrid approach is powerful for complex production scheduling.
引用
收藏
页码:129 / 136
页数:8
相关论文
共 50 条
  • [31] SIMULATION OPTIMIZATION FOR INDUSTRIAL SCHEDULING USING HYBRID GENETIC REPRESENTATION
    Andersson, Marcus
    Ng, Amos H. C.
    Grimm, Henrik
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2004 - 2011
  • [32] Component scheduling for chip shooter machines: a hybrid genetic algorithm approach
    Ho, W
    Ji, P
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (14) : 2175 - 2189
  • [33] A simulation and genetic algorithm approach to stochastic research constrained project scheduling
    PetEdwards, J
    SOUTHCON/96 - CONFERENCE RECORD, 1996, : 333 - 338
  • [34] A genetic algorithm based approach for integration of process planning and production scheduling
    Zhao, FQ
    Hong, Y
    Yu, DM
    Yang, YH
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON INTELLIGENT MECHATRONICS AND AUTOMATION, 2004, : 483 - 488
  • [35] Genetic algorithm approach to earliness and tardiness production scheduling and planning problem
    Li, Y
    Ip, WH
    Wang, DW
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 54 (01) : 65 - 76
  • [36] A Hybrid Genetic Algorithm for Integrated Production and Distribution Scheduling Problem with Outsourcing Allowed
    Izadi, L.
    Ahmadizar, F.
    Arkat, J.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2020, 33 (11): : 2285 - 2298
  • [37] A Simulation Approach to Hybrid Flowshop Scheduling Using Dispatching Rules
    Song, C.
    Luo, H.
    Qu, T.
    Lv, H. L.
    Huang, George Q.
    PROCEEDINGS OF THE 6TH CIRP-SPONSORED INTERNATIONAL CONFERENCE ON DIGITAL ENTERPRISE TECHNOLOGY, 2010, 66 : 877 - 884
  • [38] A computational approach to imprecise jobshop scheduling using a genetic algorithm
    Dalton, JA
    McGregor, JI
    Sen, P
    Calveley, D
    COMPUTER-BASED DESIGN, 2002, : 539 - 549
  • [39] GENETIC ALGORITHM MODIFICATION FOR PRODUCTION SCHEDULING
    Brzeczek, Tomasz
    Nowak, Dariusz
    FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2013, 38 (04) : 299 - 309
  • [40] PROGENITOR - A GENETIC ALGORITHM FOR PRODUCTION SCHEDULING
    KOPFER, H
    WIRTSCHAFTSINFORMATIK, 1992, 34 (02): : 255 - 256