共 50 条
- [41] Designing a new spillway for the Rassisse Dam LABYRINTH AND PIANO KEY WEIRS II - PKW 2013, 2014, : 169 - 176
- [43] Infrastructure: Calaveras Dam spillway completed Civil Engineering Magazine Archive, 2016, 86 (7-8): : 26 - 28
- [46] The calculation of the dynamic characteristics of the spillway of the dam Magazine of Civil Engineering, 2022, 113 (05):
- [49] Study on Water Flow Capacity and Related Parameters of Spillway Gate of Orifice Outflow Dam Water Conservation Science and Engineering, 2021, 6 : 191 - 200