共 50 条
- [42] Bi-objective heuristics for multi-item freights distribution planning problem in crossdocking networks INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (9-12): : 1201 - 1216
- [43] Coordinating supply chain response-time: a bi-level programming approach The International Journal of Advanced Manufacturing Technology, 2007, 31 : 1034 - 1043
- [45] Coordinating supply chain response-time: A bi-level programming approach International Journal of Advanced Manufacturing Technology, 2007, 31 (9-10): : 1034 - 1043
- [47] Coordinating supply chain response-time: a bi-level programming approach INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 31 (9-10): : 1034 - 1043
- [48] The Study on Supply Chain Distribution Optimization Based on Bi-level Programming Model 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 3, PROCEEDINGS, 2009, : 7 - 10
- [49] A Gray Programming Model for Bi-Level Distribution Network Designing in the Supply Chain 2009 INTERNATIONAL SYMPOSIUM ON WEB INFORMATION SYSTEMS AND APPLICATIONS, PROCEEDINGS, 2009, : 264 - 266
- [50] Bi-objective heuristics for multi-item freights distribution planning problem in crossdocking networks The International Journal of Advanced Manufacturing Technology, 2012, 58 : 1201 - 1216