Multi-item bi-level supply chain planning with multiple remanufacturing of reusable by-products

被引:16
|
作者
Rowshannahad, Mehdi [1 ]
Absi, Nabil [2 ]
Dauzere-Peres, Stephane [2 ,3 ]
Cassini, Bernard [4 ]
机构
[1] Continental AG, Competence Ctr Supply Chain Management, Hannover, Germany
[2] Ecole Mines St Etienne, LIMOS, CNRS, UMR 6158, Gardanne, France
[3] BI Norwegian Business Sch, Dept Accounting Auditing & Business Analyt, Oslo, Norway
[4] Soitec, Parc Technol Fontaines, Bernin, France
关键词
Closed-loop supply chain planning; By-production; Remanufacturing; Bi-level capacitated lot-sizing; LOT-SIZING PROBLEM; MANAGEMENT; COMPLEXITY; FORMULATIONS; HEURISTICS; ALGORITHMS; SYSTEMS; MODELS;
D O I
10.1016/j.ijpe.2018.01.014
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we investigate a multi-item production planning problem in which remanufacturable raw materials are used for manufacturing the final products. The used raw material (considered as a kind of by-product) needs to be remanufactured before being suitable to be used again to manufacture other final products. However, by-products can be remanufactured only a given number of times. The manufacturing and remanufacturing processes are performed in separated production processes with limited capacity. Each product may be produced using specific raw material references (newly purchased and/or remanufactured). The original industrial case study is based on the supply chain of Silicon-On-Insulator fabrication units. The problem is modeled as a mixed-integer linear mathematical program. Using numerical examples based on industrial data, the model is validated and its behavior is analyzed. Finally, some industrial and academic perspectives to this study are proposed.
引用
收藏
页码:25 / 37
页数:13
相关论文
共 50 条
  • [41] Missing data in a multi-item instrument were best handled by multiple imputation at the item score level
    Eekhout, Iris
    de Vet, Henrica C. W.
    Twisk, Jos W. R.
    Brand, Jaap P. L.
    de Boer, Michiel R.
    Heymans, Martijn W.
    JOURNAL OF CLINICAL EPIDEMIOLOGY, 2014, 67 (03) : 335 - 342
  • [42] Bi-objective heuristics for multi-item freights distribution planning problem in crossdocking networks
    Marjani, Mohammad Reza
    Husseini, Seyyed Mohammad Moattar
    Karimi, Behrooz
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (9-12): : 1201 - 1216
  • [43] Coordinating supply chain response-time: a bi-level programming approach
    W. Yang
    L. Li
    S. Ma
    The International Journal of Advanced Manufacturing Technology, 2007, 31 : 1034 - 1043
  • [44] A bi-level programming approach for production-distribution supply chain problem
    Amirtaheri, Omid.
    Zandieh, Mostafa
    Dorri, Behrouz
    Motameni, A. R.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 110 : 527 - 537
  • [45] Coordinating supply chain response-time: A bi-level programming approach
    Yang, W.
    Li, L.
    Ma, S.
    International Journal of Advanced Manufacturing Technology, 2007, 31 (9-10): : 1034 - 1043
  • [46] Manufacturer-retailer supply chain coordination: A bi-level programming approach
    Sadigh, Ali Naimi
    Mozafari, Marzieh
    Karimi, Behrooz
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 45 (01) : 144 - 152
  • [47] Coordinating supply chain response-time: a bi-level programming approach
    Yang, W.
    Li, L.
    Ma, S.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 31 (9-10): : 1034 - 1043
  • [48] The Study on Supply Chain Distribution Optimization Based on Bi-level Programming Model
    Yang, Jianhua
    Hao, Zhangang
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 3, PROCEEDINGS, 2009, : 7 - 10
  • [49] A Gray Programming Model for Bi-Level Distribution Network Designing in the Supply Chain
    Han, Jin-fang
    Liu, Zhi-yong
    2009 INTERNATIONAL SYMPOSIUM ON WEB INFORMATION SYSTEMS AND APPLICATIONS, PROCEEDINGS, 2009, : 264 - 266
  • [50] Bi-objective heuristics for multi-item freights distribution planning problem in crossdocking networks
    Mohammad Reza Marjani
    Seyyed Mohammad Moattar Husseini
    Behrooz Karimi
    The International Journal of Advanced Manufacturing Technology, 2012, 58 : 1201 - 1216