Hydro-Quebec's Defense Plan: Present and Future

被引:0
|
作者
Heniche, Annissa [1 ]
Kamwa, Innocent [1 ]
Dobrescu, Manuela [2 ]
机构
[1] Hydro Quebec IREQ, Innocent, Varennes, PQ, Canada
[2] Hydro Quebec TransEnergie, Montreal, PQ, Canada
关键词
Defense plans; Event detection; Instability detection; Special Protection Schemes; SYSTEM;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Recent cascading failures in several power systems worldwide have highlighted the necessity to develop new automatic protection systems. Furthermore, economic and environmental considerations strictly limit the addition of new transmission lines, which implies that the more the power system develops, the more it becomes stressed. Consequently it is necessary to re-evaluate the performance of automatic protection systems in their new environment to ensure their effectiveness in order to maintain power system reliability and security. This paper presents two new Special Protection Schemes (SPSs) that will be incorporated into Hydro-Quebec's current defense plan as a means to maintain its performance and satisfy all the design criteria of its future network.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Restoration plan - The Hydro-Quebec experience
    Levesque, Francois
    Phan, Si Truc
    Dumas, Anyk
    Boisvert, Martin
    [J]. 2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 4889 - 4894
  • [2] Hydro-Quebec's defence plan against extreme contingencies
    Trudel, G
    Bernard, S
    Scott, G
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) : 958 - 965
  • [3] Wide-area monitoring and control at hydro-quebec: Past, present and future
    Kamwa, I.
    Beland, J.
    Trudel, G.
    Grondin, R.
    Lafond, C.
    McNabb, D.
    [J]. 2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 4070 - +
  • [4] Hydro-Quebec's vision of the distribution automation
    Simard, G.
    Lavoie, V.
    Chartrand, D.
    [J]. 2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 333 - +
  • [5] HYDRO-QUEBEC FIBER STUDY
    BOULET, L
    [J]. LASER FOCUS WITH FIBEROPTIC TECHNOLOGY, 1980, 16 (03): : 8 - 8
  • [6] Hydro-Quebec's new approach for asset management
    Delavari, Atieh
    Prevost, Jacques
    Gaha, Mohamed
    Dems, Amira
    [J]. 2020 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2020,
  • [7] LANGUAGE RELATIONS IN HYDRO-QUEBEC
    CHARTIER, R
    [J]. RELATIONS INDUSTRIELLES-INDUSTRIAL RELATIONS, 1965, 20 (03): : 528 - 539
  • [8] HYDRO-QUEBEC - THE SOCIETY AT PRESENT - FRENCH - FAUCHER,P, BERGERON,J
    DUHAIME, G
    [J]. CANADIAN JOURNAL OF POLITICAL SCIENCE-REVUE CANADIENNE DE SCIENCE POLITIQUE, 1986, 19 (04): : 841 - 843
  • [9] Hydro-Quebec and the Quebec State, 1944-2005
    Perron, Dominique
    [J]. HISTOIRE SOCIALE-SOCIAL HISTORY, 2016, 49 (98): : 224 - 225
  • [10] Programmable load shedding systems Hydro-Quebec's experience
    Coté, P
    Coté, SP
    Lacroix, M
    [J]. 2001 POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2001, : 818 - 823