Hydro-Quebec's defence plan against extreme contingencies

被引:40
|
作者
Trudel, G [1 ]
Bernard, S [1 ]
Scott, G [1 ]
机构
[1] Hydro Quebec, Montreal, PQ, Canada
关键词
Defence plan; Extreme contingency; Generation rejection; Load shedding; Remedial action scheme; Special protection system;
D O I
10.1109/59.780908
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In recent years, Hydro-Quebec has undertaken a major program to upgrade the reliability of its transmission system. Much effort has focused on increasing the system's ability to withstand extreme contingencies, usually caused by multiple incidents or the successive tripping of transmission lines. In order to counteract such events on its system, Hydro-Quebec has adopted a number of special defensive measures, globally called "defence plan against extreme contingencies". The goal of this plan, which will be fully operational by 1998, is to detect and confine incidents that exceed the system's strength. Entirely automatic, it will rely mainly on: a generation rejection and/or remote load shedding system (RPTC) a 735 kV shunt reactor automatic switching system; an undervoltage load shedding system; an underfrequency load shedding system. This paper summarizes Hydro-Quebec's current orientation for safeguarding its system after extreme contingencies and describes the various automatic measures adopted and, in particular, the RPTC system, one of the main components of the defence plan. The RPTC system will detect multiple line losses directly from fifteen 735-kV substations, include four generation rejection sites and a centralized remote load shedding system.
引用
收藏
页码:958 / 965
页数:8
相关论文
共 50 条
  • [1] Restoration plan - The Hydro-Quebec experience
    Levesque, Francois
    Phan, Si Truc
    Dumas, Anyk
    Boisvert, Martin
    [J]. 2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 4889 - 4894
  • [2] Hydro-Quebec's Defense Plan: Present and Future
    Heniche, Annissa
    Kamwa, Innocent
    Dobrescu, Manuela
    [J]. 2013 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PES), 2013,
  • [3] Hydro-Quebec's vision of the distribution automation
    Simard, G.
    Lavoie, V.
    Chartrand, D.
    [J]. 2005/2006 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2006, : 333 - +
  • [4] HYDRO-QUEBEC FIBER STUDY
    BOULET, L
    [J]. LASER FOCUS WITH FIBEROPTIC TECHNOLOGY, 1980, 16 (03): : 8 - 8
  • [5] Hydro-Quebec's new approach for asset management
    Delavari, Atieh
    Prevost, Jacques
    Gaha, Mohamed
    Dems, Amira
    [J]. 2020 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2020,
  • [6] LANGUAGE RELATIONS IN HYDRO-QUEBEC
    CHARTIER, R
    [J]. RELATIONS INDUSTRIELLES-INDUSTRIAL RELATIONS, 1965, 20 (03): : 528 - 539
  • [7] Brazilian defense plan against extreme contingencies
    Gomes, P
    Chipp, HJ
    Ordacgi, JM
    Sardinha, SLD
    [J]. QUALITY AND SECURITY OF ELECTRIC POWER DELIVERY SYSTEMS, 2003, : 181 - 186
  • [8] Brazilian defense plan against extreme contingencies
    Vieira, X
    Pilottto, LAS
    Martins, N
    Carvalho, ARC
    Bianco, A
    [J]. 2001 POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2001, : 834 - 839
  • [9] Hydro-Quebec and the Quebec State, 1944-2005
    Perron, Dominique
    [J]. HISTOIRE SOCIALE-SOCIAL HISTORY, 2016, 49 (98): : 224 - 225
  • [10] Programmable load shedding systems Hydro-Quebec's experience
    Coté, P
    Coté, SP
    Lacroix, M
    [J]. 2001 POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, 2001, : 818 - 823