TOWARD AN INTEGRATIVE PERSPECTIVE ON ALLIANCE GOVERNANCE: CONNECTING CONTRACT DESIGN, TRUST DYNAMICS, AND CONTRACT APPLICATION

被引:99
|
作者
Faems, Dries [1 ,2 ]
Janssens, Maddy [2 ]
Madhok, Anoop [3 ,4 ]
Van Looy, Bart [5 ]
机构
[1] Univ Twente, Dept Operat Org & Human Resources, Fac Management & Governance, Enschede, Netherlands
[2] Katholieke Univ Leuven, Res Ctr Org Studies, Fac Business & Econ, Louvain, Belgium
[3] Vrije Univ Amsterdam, Ctr Comparat Social Studies, Amsterdam, Netherlands
[4] York Univ, Schulich Sch Business, N York, ON M3J 1P3, Canada
[5] Katholieke Univ Leuven, Dept Managerial Econ Strategy & Innovat, Fac Business & Econ, Louvain, Belgium
来源
ACADEMY OF MANAGEMENT JOURNAL | 2008年 / 51卷 / 06期
关键词
D O I
10.5465/AMJ.2008.35732527
中图分类号
F [经济];
学科分类号
02 ;
摘要
On the basis of a case study of two sequential alliances between the same firms, we develop a more integrative perspective on alliance governance, providing insights into the interactions between structural and relational aspects, both within and between transactions. In particular, we disentangle (1) how contracts with a similar degree but different nature of formalization (narrow versus broad) trigger different kinds of trust dynamics (negative versus positive) at both operational and managerial levels, (2) how trust dynamics and contract application (rigid versus flexible) coevolve over time, and (3) how relational dynamics in previous transactions influence the design of contracts in subsequent transactions.
引用
收藏
页码:1053 / 1078
页数:26
相关论文
共 50 条
  • [31] International Joint Venture Governance Mechanisms: The Role of Institutional Environment on Contract Design
    Choi, Jeongho
    Velez-Calle, Andres
    Contractor, Farok J.
    CORPORATE GOVERNANCE-AN INTERNATIONAL REVIEW, 2024,
  • [32] Application invariants: Design by Contract augmented with deployment correctness logic
    Savidis, A
    SOFTWARE-PRACTICE & EXPERIENCE, 2006, 36 (03): : 255 - 282
  • [33] Safety Improvement of Sustainable Coal Transportation in Mines: A Contract Design Perspective
    Tu, Jun
    Wan, Liangdong
    Sun, Zijiao
    SUSTAINABILITY, 2023, 15 (03)
  • [34] Underground design-build contract delivery: the designer's perspective
    Romero, VS
    Adams, DN
    NORTH AMERICAN TUNNELING 2000: UNDERGROUND CONSTRUCTION: THE REVOLUTION CONTINUES, 2000, : 287 - 297
  • [35] Contract design capability as a trust enabler in the pre-formation phase of interfirm relationships
    Shen, Lu
    Su, Chenting
    Zheng, Xu
    Zhuang, Guijun
    JOURNAL OF BUSINESS RESEARCH, 2019, 95 : 103 - 115
  • [36] Trust, security, and contract management challenges for grid-based application service provision
    Gaeta, M
    Laria, G
    Ritrovato, P
    Romano, N
    Serhan, B
    Wesner, S
    Dimitrakos, T
    Mac Randal, D
    TRUST MANAGEMENT, PROCEEDING, 2004, 2995 : 362 - 368
  • [37] Research on the Trust Cycle of the Contract Parties of Mega-projects Based on the Whole Process Perspective
    Wang Yihong
    Rong Nana
    Deng Binchao
    IMMS 2019: 2019 2ND INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT AND MANAGEMENT SCIENCES, 2018, : 140 - 144
  • [39] Smart Contract Design for a Bidding-based Supply Chain System built on an Alliance Blockchain
    Li, Xuewei
    Chen, Han
    Xie, Zhiyuan
    Xie, Ying
    Yang, Antao
    2021 THE 3RD INTERNATIONAL CONFERENCE ON BLOCKCHAIN TECHNOLOGY, ICBCT 2021, 2021, : 1 - 8
  • [40] Incentive contract design considering quotas production: A principal-agent perspective
    Liu, Sen
    Wang, Lei
    Shi, Xuejiang
    Ouyang, Shibo
    Yang, Lifan
    HELIYON, 2024, 10 (02)