Assembly System Reconfiguration Planning

被引:26
|
作者
Bryan, April [1 ]
Hu, S. Jack [1 ]
Koren, Yoram [1 ]
机构
[1] Univ Michigan, Dept Mech Engn, Ann Arbor, MI 48109 USA
来源
JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME | 2013年 / 135卷 / 04期
关键词
reconfiguration planning; product family; reconfigurable manufacturing systems; life cycle costs; assembly system; DESIGN; ALGORITHMS; PRODUCTS;
D O I
10.1115/1.4024288
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Decreasing product life cycles and reduced product development times have led to a need for new strategies for coping with the rapid rate of product family design changes. In this paper, assembly system reconfiguration planning (ASRP) is introduced as a method for cost effectively designing several generations of assembly systems in order to produce a product family that gradually evolves over time. In the ASRP approach, the possible assembly systems for each generation are first considered and then the sequence of assembly system configurations that minimize the life cycle cost of the process are selected. A nonlinear integer optimization formulation is developed for finding the cost minimizing assembly system reconfiguration plan using the ASRP approach. Dynamic programming and genetic algorithm are used to solve the optimization problem. Simulation results indicate that the ASRP approach leads to the minimum life cycle costs of the assembly system, and the relative cost of reconfiguration and production have an impact on the assembly system reconfiguration plan selected. Comparison of the results of the dynamic program and genetic algorithm indicate that the dynamic program is more computationally efficient for small problems and genetic algorithm is preferred for larger problems.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Integrated Virtual Assembly Process Planning System
    Liu Jianhua
    Hou Weiwei
    Shang Wei
    Ning Ruxin
    CHINESE JOURNAL OF MECHANICAL ENGINEERING, 2009, 22 (05) : 717 - 728
  • [22] The planning of the best production route in the assembly system
    Dobrzanska-Danikiewicz, Anna
    Krenczyk, Damian
    INTERNATIONAL JOURNAL OF MATERIALS & PRODUCT TECHNOLOGY, 2008, 33 (03): : 213 - 225
  • [23] Planning of modular fixtures in a robotic assembly system
    Tohidi, Hossein
    AlGeddawy, Tarek
    RESEARCH AND INNOVATION IN MANUFACTURING: KEY ENABLING TECHNOLOGIES FOR THE FACTORIES OF THE FUTURE - PROCEEDINGS OF THE 48TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2016, 41 : 252 - 257
  • [24] HUMANIZATION AND PRODUCTIVITY - PLANNING A FLEXIBLE ASSEMBLY SYSTEM
    METZGER, H
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1977, 67 (01): : 31 - 35
  • [25] Planning of workstations in a modular automotive assembly system
    Kern, Wolfgang
    Rusitschka, Fabian
    Bauernhansl, Thomas
    FACTORIES OF THE FUTURE IN THE DIGITAL ENVIRONMENT, 2016, 57 : 327 - 332
  • [26] Integrated Virtual Assembly Process Planning System
    LIU Jianhua
    Chinese Journal of Mechanical Engineering, 2009, 22 (05) : 717 - 728
  • [27] A data model for an assembly planning software system
    Tran, P
    Grewal, S
    COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1997, 10 (04): : 267 - 275
  • [28] Development of a robot assembly task planning system
    Sun, HY
    INTELLIGENT ASSEMBLY AND DISASSEMBLY (IAD'98), 1998, : 23 - 28
  • [29] The Archimedes 2 mechanical assembly planning system
    Kaufman, SG
    Wilson, RH
    Jones, RE
    Calton, TL
    Ames, AL
    1996 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, PROCEEDINGS, VOLS 1-4, 1996, : 3361 - 3368
  • [30] Automated hierarchical assembly system construction in automobile body assembly planning
    Wang, WR
    Chen, GL
    Lin, ZQ
    Lai, XM
    JOURNAL OF MECHANICAL DESIGN, 2005, 127 (02) : 347 - 351