Analysis model for the excavation damage zone in surrounding rock mass of circular tunnel

被引:29
|
作者
Yang, Haiqing [1 ]
Huang, Da
Yang, Xiuming
Zhou, Xiaoping
机构
[1] Chongqing Univ, Sch Civil Engn, Chongqing 400045, Peoples R China
基金
中国国家自然科学基金;
关键词
Excavation damage zone; Rock mass; Tunnel; Microcracks; Equivalent crack method;
D O I
10.1016/j.tust.2012.12.006
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The time dependent viscoelastic model is extended so that excavation lining process of tunnel can be taken into account, with special attention on the analysis of the excavation damage zone around a circular tunnel under hydrostatic condition. Combining the sliding crack model and equivalent crack method, an analytical model for the evolution of fractured zone in viscoelastic surrounding rock mass is proposed. The whole construction process of tunnel is divided into three stages, in which the stress and displacement are considered separately. Then, the time dependent evolution of EDZ is implemented in a short computation algorithm, in which both extent and direction of fractured zones are determined. It is key important for the settlement of rock bolt. Through sensitivity analysis of parameters, the dependence of EDZ on time, excavation velocity, structure of heterogeneous rock mass, lining supporting system, initial geostress and the radius of tunnel are determined. Because of the time dependence of rock mass, the failure and deformation behavior continue increasing, even if the excavation process finished. In addition, the displacement after lining is set up is far more than the one at the moment of excavation just finished. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:78 / 88
页数:11
相关论文
共 50 条
  • [31] Surrounding rock instability based on catastrophe model of deep-buried tunnel excavation
    Zhu, Yun-Hua
    Liu, Xin-Rong
    Huang, Ming
    Li, Xiao-Hong
    Shu, Zhi-Le
    Yantu Lixue/Rock and Soil Mechanics, 2009, 30 (03): : 805 - 809
  • [32] Damage mechanism and stability analysis of rock mass in the high geo-stress tunnel subjected to excavation
    Ding, Quanfu
    Li, Biao
    Su, Haijian
    Xu, Nuwen
    Li, Xuehua
    Deng, Xingyang
    GEOMATICS NATURAL HAZARDS & RISK, 2022, 13 (01) : 75 - 93
  • [33] Micromechanical analysis of excavation damaged zone in anisotropic rock mass
    Wang, Shuhong
    Qiao, Dengpan
    Jia, Peng
    Zhang, Nan
    FRACTURE AND DAMAGE MECHANICS V, PTS 1 AND 2, 2006, 324-325 : 81 - +
  • [34] A classification method of surrounding rock mass quality based on tunnel milling excavation construction adaptability
    Cao W.
    Li S.
    Zhang Y.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2019, 38 (08): : 1513 - 1522
  • [35] Investigation of excavation damage zone in Himalayan tunnel
    Verma, H.K.
    Samadhiya, N.K.
    Singh, M.
    Prasad, V.V.R.
    Journal of Mines, Metals and Fuels, 2014, 62 (07): : 196 - 200
  • [36] Determination Method of Excavation Damage Zone Based on Surrounding Rock Damage-Fracture Ratio in Underground Engineering
    Guo, Haosen
    Tong, Jiaqi
    Sun, Qiancheng
    Yang, Xu
    Luo, Wenjun
    Yu, Yang
    FRONTIERS IN EARTH SCIENCE, 2022, 10
  • [37] Weakening laws of rock mass properties in blasting excavation damage zone of high rock slopes
    Yang J.-H.
    Dai J.-H.
    Yao C.
    Jiang S.-H.
    Jiang Q.-H.
    Yao, Chi (chi.yao@ncu.edu.cn), 1600, Chinese Society of Civil Engineering (42): : 968 - 975
  • [38] Prediction Model for Performance Evaluation of Tunnel Excavation in Blocky Rock Mass
    Roy, Nishant
    Sarkar, Rajib
    Bharti, Shiv Dayal
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2018, 18 (01)
  • [39] Study on the influence of surrounding rock to the tunnel excavation by numerical simulation
    Yu, Y. Q.
    Yang, X. L.
    Liang, W. M.
    Hu, M. Y.
    BOUNDARIES OF ROCK MECHANICS: RECENT ADVANCES AND CHALLENGES FOR THE 21ST CENTURY, 2008, : 861 - 866
  • [40] Research on Deformation Law of Surrounding Rock During Excavation of Tunnel
    Zhao, Deshen
    Wang, Yunping
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ELECTROMECHANICAL CONTROL TECHNOLOGY AND TRANSPORTATION, 2015, 41 : 106 - 110