Optimizing planned lead times for enhancing performance of MRP systems

被引:21
|
作者
Milne, R. John [1 ]
Mahapatra, Santosh [1 ]
Wang, Chi-Tai [2 ]
机构
[1] Clarkson Univ, Sch Business, Potsdam, NY 13699 USA
[2] Natl Cent Univ, Inst Ind Management, Taoyuan 32001, Taiwan
关键词
Planned lead time (PLT); Material Requirements Planning (MRP); Mixed integer program (MIP);
D O I
10.1016/j.ijpe.2015.05.013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Material Requirements Planning (MRP) systems are frequently used in discrete parts manufacturing to determine planned order releases. This paper proposes a mixed integer program (MIP) model to determine the optimal values of planned lead times to be used by an MRP system. The MIP contains a set of integrated constraints that determine planned orders similar to how an MRP system would while executing these planned orders under capacity and component availability constraints. The model includes an optional fixed-periods lot sizing policy and minimizes the costs of excess finished and in-process inventories, setups, backorders, exceeding capacity (e.g. outsourcing), and changes in planned lead times. Experimental results-using data from a DRAM manufacturer-indicate that the proposed method of determining planned lead times is superior to a commonly used ad hoc method for determining the planned lead times used by an MRP system. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:220 / 231
页数:12
相关论文
共 50 条
  • [21] A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint
    Louly, Mohamed-Aly
    Dolgui, Alexandre
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 140 (02) : 778 - 781
  • [22] Viscosity solution in MRP theory and supply networks for non zero lead times
    Bogataj, Ludvik
    Bogataj, Marija
    SOR'07: PROCEEDINGS OF THE 9TH INTERNATIONAL SYMPOSIUM ON OPERATIONAL RESEARCH IN SLOVENIA, 2007, : 169 - 175
  • [23] Performance analysis and optimization of assemble-to-order systems with random lead times
    Song, JS
    Yao, DD
    OPERATIONS RESEARCH, 2002, 50 (05) : 889 - 903
  • [24] Enhancing planned and associated biodiversity in French farming systems
    Marion Casagrande
    Lionel Alletto
    Christophe Naudin
    Arthur Lenoir
    Ali Siah
    Florian Celette
    Agronomy for Sustainable Development, 2017, 37
  • [25] Enhancing planned and associated biodiversity in French farming systems
    Casagrande, Marion
    Alletto, Lionel
    Naudin, Christophe
    Lenoir, Arthur
    Siah, Ali
    Celette, Florian
    AGRONOMY FOR SUSTAINABLE DEVELOPMENT, 2017, 37 (06)
  • [26] Optimizing Scan Times of BLE Scanning Systems
    Daigle, John N.
    Humphrey, George A., II
    Lena, Henry C.
    Sarker, Avijit
    2020 29TH INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATIONS AND NETWORKS (ICCCN 2020), 2020,
  • [27] A ROBUST OPTIMIZATION APPROACH FOR PRODUCTION PLANNING UNDER EXOGENOUS PLANNED LEAD TIMES
    Albey, Erinc
    Yanikoglu, Ihsan
    Uzsoy, Reha
    2019 WINTER SIMULATION CONFERENCE (WSC), 2019, : 2312 - 2323
  • [28] Setting optimal production lot sizes and planned lead times in a job shop
    Yuan, Rong
    Graves, Stephen C.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (20) : 6105 - 6120
  • [29] Linear programming models with planned lead times for Supply Chain Operations Planning
    Spitter, JM
    Hurkens, CAJ
    de Kok, AG
    Lenstra, JK
    Negenman, EG
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 163 (03) : 706 - 720
  • [30] Key performance indicators for supply planning of multilevel serial systems with stochastic lead times
    Hnaien, Faicel
    Dolgui, Alexandre
    Louly, Mohamed Aly O.
    CONTROL AND CYBERNETICS, 2010, 39 (01): : 133 - 148