Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains

被引:27
|
作者
Rasti-Barzoki, Morteza [1 ]
Hejazi, Seyed Reza [1 ]
机构
[1] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan 841568311, Iran
关键词
Supply chain management; Supply chain scheduling; Due date assignment; Batch delivery and tardy job; BOUND ALGORITHM;
D O I
10.1016/j.ejor.2013.01.002
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, an integrated due date assignment and production and batch delivery scheduling problem for make-to-order production system and multiple customers is addressed. Consider a supply chain scheduling problem in which n orders (jobs) have to be scheduled on a single machine and delivered to K customers or to other machines for further processing in batches. A common due date is assigned to all the jobs of each customer and the number of jobs in delivery batches is constrained by the batch size. The objective is to minimize the sum of the total weighted number of tardy jobs, the total due date assignment costs and the total batch delivery costs. The problem is NP-hard. We formulate the problem as an Integer Programming (IP) model. Also, in this paper, a Heuristic Algorithm (HA) and a Branch and Bound (B&B) method for solving this problem are presented. Computational tests are used to demonstrate the efficiency of the developed methods. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:345 / 357
页数:13
相关论文
共 18 条