Comment on "A simple way to incorporate uncertainty and risk into forest harvest scheduling"

被引:4
|
作者
Eyvindson, Kyle [1 ]
Kangas, Annika [2 ]
机构
[1] Univ Jyvaskyla, Dept Biol & Environm Sci, POB 35, Jyvaskyla 40014, Finland
[2] Nat Resources Inst Finland Luke, Econ & Soc, POB 68, Joensuu 80101, Finland
关键词
Stochastic programming; Risk; Uncertainty; Conditional Value at Risk;
D O I
10.1016/j.foreco.2016.03.038
中图分类号
S7 [林业];
学科分类号
0829 ; 0907 ;
摘要
In a recent research article, Robinson et al. (2016) described a method of estimating uncertainty of harvesting outcomes by analyzing the historical yield to the associated prediction for a large number of harvest operations. We agree with this analysis, and consider it a useful tool to integrate estimates of uncertainty into the optimization process. The authors attempt to manage the risk using two different methods, based on deterministic integer linear programming. The first method focused on maximizing the 10th quantile of the distribution of predicted volume subject to area constraint, while the second method focused on minimizing the variation of total quantity of volume harvested subject to a harvest constraint. The authors suggest that minimizing the total variation of the harvest could be a useful tool to manage risk. Managing risks requires trade-offs, however, typically less risk involves higher costs. The authors only superficially stated the costs and did not consider if these costs are reasonable for the management of risk. In this comment, we specifically develop the models used in their article, and demonstrate a method of managing the downside risk by utilizing the Conditional Value at Risk. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:86 / 91
页数:6
相关论文
共 50 条
  • [31] Operational harvest planning under forest road maintenance uncertainty
    Gomes, Vanessa de Souza
    Monti, Cassio Augusto Ussi
    Silva, Carolina Souza Jarochinski e
    Gomide, Lucas Rezende
    FOREST POLICY AND ECONOMICS, 2021, 131
  • [32] Reframing Forest Harvest Scheduling Models for Ecosystem Services Management
    Nobre, Silvana Ribeiro
    Mcdill, Marc Eric
    Rodriguez, Luiz Carlos Estraviz
    Diaz-Balteiro, Luis
    FORESTS, 2024, 15 (12):
  • [33] A Simple Way to Incorporate Carbon Nanotubes in Polymers: Nanostructured Road Marking Paint
    de Souza, Iara Alves Martins
    de Almeida, Marconi Oliveira
    Soncim, Sergio Pacifico
    da Silva, Merces Coelho
    de Morais, Evandro Augusto
    Carvalho, Jaqueline do Carmo Lima
    Filho, Francisco Moura
    Geraldo, Viviany
    PROCESSES, 2025, 13 (01)
  • [34] Timber harvest scheduling with price uncertainty using Markowitz portfolio optimization
    Reeves, LH
    Haight, RG
    ANNALS OF OPERATIONS RESEARCH, 2000, 95 (1-4) : 229 - 250
  • [35] Timber harvest scheduling with price uncertainty using Markowitz portfolio optimization
    Laurence H. Reeves
    Robert G. Haight
    Annals of Operations Research, 2000, 95 : 229 - 250
  • [36] A robust optimization approach protected harvest scheduling decisions against uncertainty
    Palma, Cristian D.
    Nelson, John D.
    CANADIAN JOURNAL OF FOREST RESEARCH, 2009, 39 (02) : 342 - 355
  • [37] Multistage Sample Average Approximation for Harvest Scheduling under Climate Uncertainty
    Bagaram, Martin B.
    Toth, Sandor F.
    FORESTS, 2020, 11 (11): : 1 - 15
  • [38] Promoting large, compact mature forest patches in harvest scheduling models
    Toth, Sandor F.
    McDill, Marc E.
    ENVIRONMENTAL MODELING & ASSESSMENT, 2008, 13 (01) : 1 - 15
  • [39] Solving the integrated forest harvest scheduling model using metaheuristic algorithms
    Nader Naderializadeh
    Kevin A. Crowe
    Melika Rouhafza
    Operational Research, 2022, 22 : 2437 - 2463
  • [40] Solving the integrated forest harvest scheduling model using metaheuristic algorithms
    Naderializadeh, Nader
    Crowe, Kevin A.
    Rouhafza, Melika
    OPERATIONAL RESEARCH, 2022, 22 (03) : 2437 - 2463