THERMAL MODELING OF A SOLAR STEAM TURBINE WITH A FOCUS ON START-UP TIME REDUCTION

被引:0
|
作者
Spelling, James [1 ]
Jocker, Markus
Martin, Andrew [1 ]
机构
[1] Royal Inst Technol, Heat & Power Technol, S-10044 Stockholm, Sweden
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Steam turbines in solar thermal power plants experience a much greater number of starts than those operating in base-load plants. In order to preserve the lifetime of the turbine whilst still allowing fast starts, it is of great interest to find ways to maintain the turbine temperature during idle periods. A dynamic model of a solar steam turbine has been elaborated, simulating both the heat conduction within the body and the heat exchange with the gland steam, main steam and the environment, allowing prediction of the temperatures within the turbine during off-design operation and standby. The model has been validated against 96h of measured data from the Andasol 1 power plant, giving an average error of 1.2% for key temperature measurements. The validated model was then used to evaluate a number of modifications that can be made to maintain the turbine temperature during idle periods. Heat blankets were shown to be the most effective measure for keeping the turbine casing warm, whereas increasing the gland steam temperature was most effective in maintaining the temperature of the rotor. By applying a combination of these measures the dispatchability of the turbine can be improved significantly: electrical output can be increased by up to 9.5% after a long cool-down and up to 9.8% after a short cool-down.
引用
收藏
页码:1021 / 1030
页数:10
相关论文
共 50 条
  • [41] Thermodynamic modeling based optimization for thermal systems in heat recovery steam generator during cold start-up operation
    Sindareh-Esfahani, Peyman
    Ghaffari, Ali
    Ahmadi, Pouria
    [J]. APPLIED THERMAL ENGINEERING, 2014, 69 (1-2) : 286 - 296
  • [42] A Method for Reduction in the Start-Up Time of a Bubbling Bed Boiler Combustor
    Jain, Vijay
    Basu, Prabir
    Groulx, Dominic
    [J]. JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME, 2010, 132 (03):
  • [43] AUTOMATIC DEWATERING OF STEAM TURBINES DURING START-UP
    不详
    [J]. BRENNSTOFF-WARME-KRAFT, 1968, 20 (03): : 115 - &
  • [44] Time dependent start-up thermal analysis of a Super Fast Reactor
    Sutanto
    Oka, Yoshiaki
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2013, 263 : 129 - 137
  • [45] Hierarchical control for the start-up procedure of solar thermal fields with direct storage
    Gil, Juan D.
    Roca, Lidia
    Zaragoza, Guillermo
    Normey-Rico, Julio E.
    Berenguel, Manuel
    [J]. CONTROL ENGINEERING PRACTICE, 2020, 95
  • [46] Modeling of transient states in the start-up path during voltage and start-up power application
    Grzadzielski, Ireneusz
    Olejnik, Bartosz
    Zakrzewski, Mikolaj
    [J]. ARCHIVES OF ELECTRICAL ENGINEERING, 2019, 68 (04) : 749 - 769
  • [47] START-UP TIME OF CMOS OSCILLATORS
    RUSZNYAK, A
    [J]. IEEE TRANSACTIONS ON CIRCUITS AND SYSTEMS, 1987, 34 (03): : 259 - 268
  • [48] START-UP TIME AT PEMBROKE PINES
    GOLDSTEIN, J
    [J]. BIOCYCLE, 1992, 33 (03) : 46 - 48
  • [49] MIT ENTREPRENEURSHIP ECOSYSTEM WITH FOCUS ON START-UP DEVELOPMENT
    Zajko, Marian
    [J]. INNOVATION MANAGEMENT, ENTREPRENEURSHIP AND CORPORATE SUSTAINABILITY (IMECS 2016), 2016, : 768 - 778
  • [50] Impact of steam generator start-up limitations on the performance of a parabolic trough solar power plant
    Ferruzza, Davide
    Topel, Monika
    Laumert, Bjorn
    Haglind, Fredrik
    [J]. SOLAR ENERGY, 2018, 169 : 255 - 263