Failure modeling and optimizing preventive maintenance strategy during two-dimensional extended warranty contracts

被引:77
|
作者
Shahanaghi, Kamran [1 ]
Noorossana, Rassoul [1 ]
Jalali-Naini, Seyed Gholamreza [1 ]
Heydari, Majeed [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
关键词
Failure modeling; Periodic preventive maintenance; Two-dimensional warranty; Flexible extended warranty contract; Imperfect repair; REPAIRABLE SYSTEMS; POLICY; PRODUCTS; OPTIONS; SOLD;
D O I
10.1016/j.engfailanal.2012.09.006
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Offering extended warranty (EW) contracts for products such as automobiles is a good source of revenue for manufactures, insurers and third party companies. However, difficulties in the modeling of product's failure process and assessing corrective and preventive maintenance actions' effects on the reliability of product enforce the service providers to propose limited EW contracts with simple "minimal repair at failures" servicing strategy. In this paper for a product sold with a two-dimensional warranty, we model the failure process of product, the effect of imperfect preventive maintenance (PM) and corresponding servicing cost in terms of product's age and usage. Then, we propose a mathematical optimization model to derive optimal number and degrees of preventive repairs to minimize the EW provider's servicing cost. We also provide some guidelines to help the EW provider to design flexible EW contracts and determine their corresponding optimal maintenance strategies. To reproduce an illustrative numerical example, we use the failure history of a commercial vehicle produced in a plant in Iran. The provided results reveal that considering proper preventive maintenance strategy during the EW period may effectively reduces the cost of EW servicing. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:90 / 102
页数:13
相关论文
共 50 条
  • [21] Analysis of a two-dimensional stair-case warranty policy with preventive maintenance
    Wang J.
    Zhu S.
    Du S.
    IMA Journal of Management Mathematics, 2021, 32 : 51 - 67
  • [22] Analysis of a two-dimensional stair-case warranty policy with preventive maintenance
    Wang, Jinting
    Zhu, Sheng
    Du, Simiao
    IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2021, 32 (01) : 51 - 67
  • [23] Availability Optimization of Two-dimensional Warranty Products under Imperfect Preventive Maintenance
    Wang, Rongcai
    Cheng, Zhonghua
    Rong, Liqing
    Bai, Yongsheng
    Wang, Qian
    IEEE Access, 2021, 9 : 8099 - 8109
  • [24] Flexible decision models for a two-dimensional warranty policy with periodic preventive maintenance
    Wang, Jinting
    Zhou, Zhuang
    Peng, Hao
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 162 : 14 - 27
  • [25] Availability Optimization of Two-dimensional Warranty Products Under Imperfect Preventive Maintenance
    Wang, Rongcai
    Cheng, Zhonghua
    Rong, Liqing
    Bai, Yongsheng
    Wang, Qian
    IEEE ACCESS, 2021, 9 : 8099 - 8109
  • [26] Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty
    Park, Minjae
    Jung, Ki Mun
    Park, Dong Ho
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 170 : 1 - 9
  • [27] Integration of marketing and maintenance decisions in two-dimensional warranty contracts under a win-win strategy for two transaction sides
    Salmasnia, Ali
    Baratian, Maryam
    QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2021, 18 (04): : 484 - 504
  • [28] Two-dimensional extended warranty strategy including maintenance level and purchase time: A win-win perspective
    He, Zhen
    Wang, Dongfan
    He, Shuguang
    Zhang, Yiwen
    Dai, Anshu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 141
  • [29] Service Contract with Periodic Preventive Maintenance for a Dump Truck Sold with a Two-Dimensional Warranty
    Nasrum, A.
    Pasaribu, U. S.
    Husniah, H.
    APPLICATION OF MATHEMATICS IN INDUSTRY AND LIFE, 2016, 1716
  • [30] Two-dimensional product warranty cost model under preventive maintenance time constraints
    Wang Q.
    Cheng Z.
    Li Z.
    Bai Y.
    International Journal of Performability Engineering, 2019, 15 (04): : 1227 - 1234