共 50 条
- [21] Wafer Sojourn Time Fluctuation Analysis of Time-Constrained Dual-Arm Cluster Tools With Wafer Revisiting and Activity Time Variation [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2018, 48 (04): : 622 - 636
- [22] Petri Net-Based Cycle Time Analysis of Dual-Arm Cluster Tools With Wafer Revisiting and Swapping Strategy [J]. 2011 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), 2011,
- [23] An optimal scheduling technique for dual-arm robots in cluster tools with residency constraints [J]. PROCEEDINGS OF THE 39TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-5, 2000, : 3459 - 3464
- [24] Performance Models for Dual-arm Cluster Tools [J]. 2011 9TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2011), 2011, : 816 - 821
- [25] Efficient Approach to Failure Response of Process Module in Dual-Arm Cluster Tools With Wafer Residency Time Constraints [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2021, 51 (03): : 1612 - 1629
- [26] Failure response policy for revisiting dual-arm cluster tools based on Petri nets [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (12): : 3235 - 3246
- [28] Optimal Scheduling of Time-Constrained Single-arm Cluster Tools with Wafer Revisiting [J]. 2016 13TH INTERNATIONAL WORKSHOP ON DISCRETE EVENT SYSTEMS (WODES), 2016, : 355 - 360
- [30] Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 87 - +