Demand-Driven Train Schedule Synchronization for High-Speed Rail Lines

被引:63
|
作者
Niu, Huimin [1 ]
Tian, Xiaopeng [1 ]
Zhou, Xuesong [2 ]
机构
[1] Lanzhou Jiaotong Univ, Sch Traff & Transportat, Lanzhou 730070, Peoples R China
[2] Arizona State Univ, Sch Sustainable Engn & Built Environm, Tempe, AZ 85287 USA
基金
中国国家自然科学基金;
关键词
High-speed rail; train schedule synchronization; demand driven; dynamic programming; genetic algorithm; TIMETABLES;
D O I
10.1109/TITS.2015.2415513
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper addresses a new class of train scheduling problems with two interconnected high-speed rail lines under given and precise time-dependent origin-destination demand input. The proposed systematic schedule synchronization approach focuses on satisfying the requirements of transfer passengers from one rail line to another rail line. Aiming to minimize passenger waiting times at stations and crowding disutility in trains, a nonlinear optimization model for a single-line case is formulated to demonstrate the modeling framework of train scheduling problems. The model is then extended to a two-line case by explicitly taking into account the number of boarding and alighting passengers at the connection station. Using a state-space representation, a novel dynamic programming algorithm is designed to solve the single-line problem as a deterministic finite-state problem with sequential decisions. An integer coding-based genetic algorithm procedure is developed to solve the proposed model for general cases with two lines. A simplified real-world example illustrates that the designed schedule is beneficial to the through passengers and transfer passengers simultaneously.
引用
收藏
页码:2642 / 2652
页数:11
相关论文
共 50 条
  • [31] DYNAMIC INTERACTION BETWEEN RAIL VEHICLES AND TRACK FOR HIGH-SPEED TRAIN
    DIANA, G
    CHELI, F
    BRUNI, S
    COLLINA, A
    VEHICLE SYSTEM DYNAMICS, 1995, 24 : 15 - 30
  • [32] Train-mounted GPR for high-speed rail trackbed inspection
    Al-Nuaimy, W
    Eriksen, A
    Gasgoyne, J
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON GROUND PENETRATING RADAR, VOLS 1 AND 2, 2004, : 631 - 634
  • [33] Optimization and Simulation Research on the High-Speed Rail Train Tracking Interval
    Yan, Dawu
    Wang, Chaoyu
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 1054 - 1062
  • [34] Modeling and simulation of high-speed passenger train movements in the rail line
    曹成铉
    许琰
    李克平
    Chinese Physics B, 2013, (06) : 243 - 249
  • [35] A Demand-Driven Model for Reallocating Workers in Assembly Lines
    Perez-Wheelock, Randall Mauricio
    Ou, Wei
    Yenradee, Pisal
    Van-Nam Huynh
    IEEE ACCESS, 2022, 10 : 80300 - 80320
  • [36] High-Speed Rail
    不详
    TECHNOLOGY REVIEW, 2009, 112 (06) : 66 - 66
  • [37] Probabilistic Analysis of Flying Ballast on High-Speed Rail Lines
    Deng, Jieyi
    Jing, Guoqing
    Liu, Xiang
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2017, 2017,
  • [38] Impacts of high-speed rail lines on the city network in China
    Jiao, Jingjuan
    Wang, Jiaoe
    Jin, Fengjun
    JOURNAL OF TRANSPORT GEOGRAPHY, 2017, 60 : 257 - 266
  • [39] Rail Infrastructure Charging Systems for High-Speed Lines in Europe
    Sanchez-Borras, Marta
    Lopez-Pita, Andres
    TRANSPORT REVIEWS, 2011, 31 (01) : 49 - 68
  • [40] Train Stop Schedule Plan Optimization of High-Speed Railway Based on Time-Segmented Passenger Flow Demand
    Xu, Ruihua
    Wang, Fangsheng
    Zhou, Feng
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 899 - 906