Dynamic vehicle allocation control for automated material handling system in semiconductor manufacturing

被引:18
|
作者
Lin, James T. [1 ]
Wu, Cheng-Hung [2 ]
Huang, Chih-Wei [1 ]
机构
[1] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu 300, Taiwan
[2] Natl Taiwan Univ, Inst Ind Engn, Taipei 10617, Taiwan
关键词
AMHS; Vehicle allocation control; Markov decision process; Simulation; CONNECTING TRANSPORT AMHS;
D O I
10.1016/j.cor.2013.04.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The current study examines the dynamic vehicle allocation problems of the automated material handling system (AMHS) in semiconductor manufacturing. With the uncertainty involved in wafer lot movement, dynamically allocating vehicles to each intrabay is very difficult. The cycle time and overall tool productivity of the wafer lots are affected when a vehicle takes too long to arrive. In the current study, a Markov decision model is developed to study the vehicle allocation control problem in the AMHS. The objective is to minimize the sum of the expected long-run average transport job waiting cost. An interesting exhaustive structure in the optimal vehicle allocation control is found in accordance with the Markov decision model. Based on this exhaustive structure, an efficient algorithm is then developed to solve the vehicle allocation control problem numerically. The performance of the proposed method is verified by a simulation study. Compared with other methods, the proposed method can significantly reduce the waiting cost of wafer lots for AMHS vehicle transportation. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2329 / 2339
页数:11
相关论文
共 50 条
  • [41] Automated system makes material handling easier
    Powder and Bulk Engineering, 2002, 16 (09): : 32 - 37
  • [42] Continuous manufacturing of monoclonal antibodies: Automated downstream control strategy for dynamic handling of titer variations
    Thakur, Garima
    Bansode, Vikrant
    Rathore, Anurag S.
    JOURNAL OF CHROMATOGRAPHY A, 2022, 1682
  • [43] Continuous manufacturing of monoclonal antibodies: Automated downstream control strategy for dynamic handling of titer variations
    Thakur, Garima
    Bansode, Vikrant
    Rathore, Anurag S.
    Journal of Chromatography A, 2022, 1682
  • [44] Design and simulation of integration system between automated material handling system and manufacturing layout in the automotive assembly line
    Seha, S.
    Zamberi, J.
    Fairul, A. J.
    4TH INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING RESEARCH (ICMER2017), 2017, 257
  • [45] Pervasive integrated material handling in 300mm semiconductor manufacturing
    Giddings, RA
    Hunter, JC
    2004 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP: ADVANCING THE SCIENCE AND TECHNOLOGY OF SEMICONDUCTOR MANUFACTURING EXCELLENCE, 2004, : 274 - 278
  • [46] DIGITALIZATION SOLUTIONS FOR AUTOMATED MATERIAL HANDLING SYSTEMS IN SEMICONDUCTOR SMART FACTORIES
    Wang, Ruiji
    CONFERENCE OF SCIENCE & TECHNOLOGY FOR INTEGRATED CIRCUITS, 2024 CSTIC, 2024,
  • [47] MODELING AND WAFER DEFECT ANALYSIS IN SEMICONDUCTOR AUTOMATED MATERIAL HANDLING SYSTEMS
    Wagner, Thomas
    Schwenke, Clemens
    Kabitzsch, Klaus
    2012 WINTER SIMULATION CONFERENCE (WSC), 2012,
  • [48] The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories
    Wang, C. N.
    Lin, H. S.
    Hsu, H. P.
    Wang, Yen-Hui
    Chang, Y. P.
    4TH INTERNATIONAL CONFERENCE ON SCIENCE & ENGINEERING IN MATHEMATICS, CHEMISTRY AND PHYSICS 2016 (SCIETECH 2016), 2016, 710
  • [49] Modularized Control Algorithm for Automated Material Handling Systems
    Spindler, Markus
    Aicher, Thomas
    Schuetz, Daniel
    Vogel-Heuser, Birgit
    Guenthner, Willibald A.
    2016 IEEE 19TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS (ITSC), 2016, : 2644 - 2650
  • [50] An Integrated Scheduling and Automated Material Handling Approach for Complex Manufacturing Systems
    Driessel, R.
    Moench, L.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 826 - 830