Supply chain management;
Single vendor-single buyer;
Just-in-time;
Quality improvement;
Lead time;
Permissible delay in payments;
INTEGRATED INVENTORY MODEL;
IMPERFECT PRODUCTION PROCESS;
PERMISSIBLE DELAY;
QUALITY IMPROVEMENT;
COST REDUCTION;
REPLENISHMENT POLICIES;
SINGLE-VENDOR;
TRADE CREDIT;
SETUP COST;
PAYMENTS;
D O I:
10.1007/s00170-012-3993-7
中图分类号:
TP [自动化技术、计算机技术];
学科分类号:
0812 ;
摘要:
The success of the Japanese in the employment of just-in-time (JIT) production has received a great deal of attention in the past two decades. The underlying goal of JIT is to eliminate wastes, which can be achieved through various efforts such as shortening lead time and improving quality. The objective of this study is to extend the model of Huang et al. (Eur J Oper Res 202:473-478, 2010) by allowing deterministic variable lead time and quality improvement investment on an integrated inventory model. That is, this article develops an integrated inventory model which jointly determines the optimal order quantity, process quality, lead time, and the frequency of deliveries simultaneously. Furthermore, a solution procedure is suggested for solving the proposed model, and numerical examples are given to illustrate the benefit of coordination between vendor and buyer.
机构:
Sitananda Coll, Dept Math, PO PS Nandigram, Midnapore 721631, W Bengal, IndiaSitananda Coll, Dept Math, PO PS Nandigram, Midnapore 721631, W Bengal, India
机构:
Yonsei Univ, Dept Ind Engn, 50 Yonsei Ro, Seoul 03722, South KoreaYonsei Univ, Dept Ind Engn, 50 Yonsei Ro, Seoul 03722, South Korea
Debnath, Abhijit
Sarkar, Biswajit
论文数: 0引用数: 0
h-index: 0
机构:
Yonsei Univ, Dept Ind Engn, 50 Yonsei Ro, Seoul 03722, South Korea
Saveetha Univ, Saveetha Inst Med & Tech Sci, Saveetha Med Coll, Ctr Global Hlth Res, Chennai 600077, Tamil Nadu, India
Lovely Profess Univ, Dept Math, Phagwara 144411, Punjab, IndiaYonsei Univ, Dept Ind Engn, 50 Yonsei Ro, Seoul 03722, South Korea