Intergenerational Discounting in the Economic Evaluation of Projects

被引:9
|
作者
Nestico, Antonio [1 ]
Maselli, Gabriella [1 ]
机构
[1] Univ Salerno, I-84084 Fisciano, Italy
关键词
Economic evaluation of projects; Social discount rate; Intergenerational discounting; Declining discount rate; Economic model; DISTANT FUTURE; CULTURAL-HERITAGE; SUSTAINABILITY; RATES; MODEL;
D O I
10.1007/978-3-319-92102-0_28
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Social Discount Rate (SDR) is among the most critical parameters of the Cost-Benefit Analysis (CBA), because it strongly conditions the results. In the case of economic evaluations, that is when the analyses are conducted from the point of view of the community, the SDR allows to make financially comparable the costs and the benefits that the investment generates over time. Thus, it influences both the "weighting" of the cash flows temporal distribution and the measure of inter-generational equity associated with the project. Extremely important issues for those interventions that display their effects on a very long time horizon. In these circumstances, the traditional discount procedures show limits because they end up excessively reducing the financial terms that occur over a certain period. A possible solution to this problem is the use of hyperbolic discount procedures through declining discount rate (DDR). In the present paper we intend to first outline in essential terms the theoretical framework of the approaches proposed in the literature for the estimation of the DDR. It is about the Consumption-Based Approach to DDRs and the Expected Net Present Value (ENPV). In the second part of the study a critical examination of the same approaches is proposed, in order to highlight their limitations and prominent theoretical aspects. These elements are useful to outline research perspectives for the characterization of an innovative model for estimating the declining discount rate, which can reduce at the same time the theoretical problems and the operational difficulties of the estimation methods currently used.
引用
收藏
页码:260 / 268
页数:9
相关论文
共 50 条
  • [41] Economic evaluation of minor roading projects
    Scott, D.
    Construction Management and Economics, 1984, 2 (01) : 77 - 90
  • [42] Economic evaluation of port deepening projects
    Güler, N
    MARITIME ENGINEERING AND PORTS II, 2000, 9 : 13 - 22
  • [43] Economic evaluation of signal preemption projects
    Khasnabis, S
    Rudraraju, RK
    Baig, MF
    JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1999, 125 (02): : 160 - 167
  • [44] Economic Evaluation of the Corporate Projects' Efficiency
    Sukhova, Liliya F.
    Glaz, Yuliya A.
    Agarkova, Lyubov, V
    INDUSTRY COMPETITIVENESS: DIGITALIZATION, MANAGEMENT, AND INTEGRATION, VOL 1, 2020, 115 : 402 - 410
  • [45] Economic evaluation of signal preemption projects
    Khasnabis, Snehamay
    Rudraraju, Rama K.
    Baig, Mirza F.
    Journal of Transportation Engineering, 1999, 125 (02): : 160 - 167
  • [46] Economic Evaluation of Two Types of IT Projects
    Zhang, Jie
    Huang, Dong-bin
    PROCEEDINGS OF THE 2008 ADVANCED SOFTWARE ENGINEERING & ITS APPLICATIONS, 2008, : 63 - 66
  • [47] Methodology for the economic evaluation of exploration projects
    Rosbaco, Juan
    SPE Advanced Technology Series, 1994, 2 (01): : 104 - 110
  • [48] DISCOUNTING IN THE ECONOMIC-EVALUATION OF HEALTH-CARE INTERVENTIONS
    KRAHN, M
    GAFNI, A
    MEDICAL CARE, 1993, 31 (05) : 403 - 418
  • [49] Intertemporal equity, discounting, and economic efficiency in water policy evaluation
    Lind, RC
    CLIMATIC CHANGE, 1997, 37 (01) : 41 - 62
  • [50] Intertemporal Equity, Discounting, and Economic Efficiency in Water Policy Evaluation
    Robert C. Lind
    Climatic Change, 1997, 37 : 41 - 62