Study on a PZT Actuator Based on Pre-stressed Mechanism

被引:0
|
作者
Huang, Yi-Cheng [1 ]
Chao, Jen-Ai [2 ]
Lin Hsiang-Jung [1 ]
机构
[1] Natl Changhua Univ Educ, Dept Mechatron Engn, Changhua, Taiwan
[2] Chien Kuo Technol Univ, Changhua, Taiwan
来源
2008 IEEE/ASME INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT MECHATRONICS, VOLS 1-3 | 2008年
关键词
Actuators; PZT; Belleville springs; Pre-stress; Finite element analysis; ATILA;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper, a redesign of the prestress mechanism of the stack-type piezoelectric ceramic actuator is provided. Belleville (disc) springs which have a specific height-to-thickness ratio are constructed to generate a constant pre-stress force to the PZT and operated in a special condition. The zero-spring-rate preload mechanism is not only used to handle the tensile stress but also used in both the constant force actuation mode and elastic suspension mode. The feasibility of the concept of the output force and vibration isolation is determined by the experimental results. The comparison of the output force and the dynamic response of the pretress mechanism between the different settings of the actuator designed in this study and the commercial products reveal that the constant output force can be maintained and the new prestress mechanism exhibits an extremely low natural frequency which approach to zero as height-to-thickness ratio of the Belleville springs equal to root 2.
引用
收藏
页码:722 / +
页数:2
相关论文
共 50 条
  • [21] RAY THEORY FOR PRE-STRESSED MEDIA
    BOSCHI, E
    DICURZIO, E
    ANNALI DI GEOFISICA, 1975, 28 (01): : 97 - 110
  • [22] CONTACT HARDNESS OF PRE-STRESSED SURFACES
    AKHMATOV, VA
    RUSSIAN ENGINEERING JOURNAL, 1976, 56 (07): : 25 - 28
  • [23] Structural innovation in pre-stressed brickwork
    Pedreschi, R
    CONSTRUCTION AND BUILDING MATERIALS, 2004, 18 (02) : 99 - 109
  • [24] Pre-stressed competitive double networks
    Singh, Naveen K.
    Lesser, Alan J.
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2011, 241
  • [25] Study and Application on Compound Active Pre-stressed Support System
    Zhang Shoubao
    He Fulian
    Xie Shengrong
    Li Pengju
    Zhu Xuesong
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 2478 - 2481
  • [26] AN EXPERIMENTAL STUDY OF RC BEAM STRENGTHENED WITH PRE-STRESSED CFP
    Long, Bang-Yun
    Yuan, Guang-Lin
    Zhu, Dan-Yu
    PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING FOR YOUNG EXPERTS, VOLS I AND II, 2008, : 1434 - 1438
  • [27] Study on the Deformation of Pre-Stressed Centre Diaphragm of Pressure Sensor
    He, Shenzhi
    Hu, Guoqing
    Zhou, Yonghong
    Wang, Jianling
    Zou, Chong
    Alam, Jahangir S. M.
    PROCEEDINGS OF THE 5TH INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING, 2015, 80 : 223 - 225
  • [28] Study on Fatigue Performance of Pre-Stressed Concrete Box Girder
    Zhou, Hongyu
    Ma, Quanzhou
    Yuan, Hui
    Zhou, Yun
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [29] Experimental Verification of Pre-stressed Beams
    Tichy, Jan
    Cvancigerova, Renata
    SPECIAL CONCRETE AND COMPOSITES 2014, 2014, 1054 : 116 - 121
  • [30] ADHESION OF ELASTIC PRE-STRESSED TAPES
    Putignano, Carmine
    Afferrante, Luciano
    Gentile, Angelo
    Carbone, Giuseppe
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2014, VOL 9, 2015,