Job Shop Sequencing in Manufacturing Plants by Timed Coloured Petri Nets and Particle Swarm Optimization

被引:1
|
作者
Volpe, Gaetano [1 ]
Mangini, Agostino Marcello [1 ]
Fanti, Maria Pia [1 ]
机构
[1] Polytech Bari, Dept Elect & Informat Engn, Via Orabona 4, I-70126 Bari, Italy
来源
IFAC PAPERSONLINE | 2022年 / 55卷 / 28期
关键词
Flexible Job Shop Scheduling; Production planning; Coloured Petri Nets; Particle Swarm Optimization;
D O I
10.1016/j.ifacol.2022.10.365
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The increasing diversity of products that can be machined in a plant poses scheduling challenges in modern manufacturing environments. The problem, which is known in literature as Flexible Job Shop Scheduling, is NP-Hard in general and can be efficiently solved by metaheuristic approaches. This paper models the production plant in a Timed Coloured Petri Nets (TCPN) framework to describe production systems including flexible Computerized Numerical Control machines. Then, an algorithm is introduced to simulate the TCPN and compute the system throughput. Finally, the throughput is maximized by optimizing the job type sequencing and the amount of units of each job type that enters the system by implementing a Particle Swarm Optimization algorithm. The proposed simulation and optimization approaches are applied to a real manufacturing system producing ophthalmic lenses in order to show the effectiveness and the benefits of the proposed method. Copyright (C) 2022 The Authors.
引用
收藏
页码:350 / 355
页数:6
相关论文
共 50 条
  • [41] A Hierarchical Timed Coloured Petri Nets for BPMN-based Process Analysis
    Wang, Ching Huey
    Huang, Pei Shu
    Wang, Feng Jian
    22ND INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING & KNOWLEDGE ENGINEERING (SEKE 2010), 2010, : 417 - 420
  • [42] Transformation from Activity Diagrams with Time Properties to Timed Coloured Petri Nets
    Chang, Xuling
    Huang, Linpeng
    Hu, Jianpeng
    Li, Chen
    Cao, Bei
    2014 IEEE 38TH ANNUAL INTERNATIONAL COMPUTERS, SOFTWARE AND APPLICATIONS CONFERENCE (COMPSAC), 2014, : 267 - 272
  • [43] Supervisory Control of Manufacturing Systems Modeled by Timed Petri Nets
    Iftar, Altug
    IFAC PAPERSONLINE, 2016, 49 (31): : 120 - 124
  • [44] An efficient job-shop scheduling algorithm based on particle swarm optimization
    Lin, Tsung-Lieh
    Horng, Shi-Jinn
    Kao, Tzong-Wann
    Chen, Yuan-Hsin
    Run, Ray-Shine
    Chen, Rong-Jian
    Lai, Jui-Lin
    Kuo, I-Hong
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (03) : 2629 - 2636
  • [45] A Hybrid Particle Swarm Optimization Algorithm for Solving Job Shop Scheduling Problems
    Meng, Qiaofeng
    Zhang, Linxuan
    Fan, Yushun
    THEORY, METHODOLOGY, TOOLS AND APPLICATIONS FOR MODELING AND SIMULATION OF COMPLEX SYSTEMS, PT II, 2016, 644 : 71 - 78
  • [46] General particle swarm optimization algorithm for job-shop scheduling problem
    Sch. of Mechanical Sci. and Eng., Huazhong Univ. of S and T, Wuhan 430074, China
    Jisuanji Jicheng Zhizao Xitong, 2006, 6 (911-917+923):
  • [47] A hybrid particle swarm optimization approach for the job-shop scheduling problem
    Wei-jun Xia
    Zhi-ming Wu
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 360 - 366
  • [48] Particle swarm optimization based multi-objective job shop scheduling
    School of Automation, Wuhan Univ. of Technology, Wuhan 430070, China
    不详
    Shanghai Jiaotong Daxue Xuebao, 2007, 11 (1796-1800):
  • [49] A hybrid particle swarm optimization approach for the job-shop scheduling problem
    Xia, Wei-Jun
    Wu, Zhi-Ming
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (3-4): : 360 - 366
  • [50] An effective hybrid particle swarm optimization for flexible job shop scheduling problem
    Zhang, Guohui, 1604, Bentham Science Publishers B.V., P.O. Box 294, Bussum, 1400 AG, Netherlands (06):