共 50 条
- [32] Computer cost estimation at the concept design stage ADVANCES IN MANUFACTURING TECHNOLOGY - XIV, 2000, : 107 - 111
- [33] What is the cost of controlling quality? Activity-based cost accounting offers an answer HOSPITAL & HEALTH SERVICES ADMINISTRATION, 1997, 42 (02): : 193 - 204
- [34] Activity-based cost analysis: The case of total knee arthroplasty and cost determinants ARCHIVES OF HELLENIC MEDICINE, 2025, 42 (01): : 114 - 121
- [36] Parametric cost estimation model based on activity-based costing for China's space missions Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 301 - 304
- [37] A Parametric Cost Estimation Model to Develop Prototype of Electric Vehicle based on Activity-based Costing 2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 385 - 389
- [38] Cost Estimation Model for Few Samples and Information in Product Early Design Stage ADVANCES IN MATERIALS MANUFACTURING SCIENCE AND TECHNOLOGY XIII, VOL II: MODERN DESIGN THEORY AND METHODOLOGY, MEMS AND NANOTECHNOLOGY, AND MATERIAL SCIENCE AND TECHNOLOGY IN MANUFACTURING, 2009, 628-629 : 311 - 316
- [39] An activity-based cost calculation for a kraft pulp mill TAPPI JOURNAL, 2012, 11 (09): : 19 - 27
- [40] Corporate cost of occupational accidents: an activity-based analysis ACCIDENT ANALYSIS AND PREVENTION, 2004, 36 (02): : 173 - 182