Multi-Objective Optimization of Flexible Period Preventive Maintenance on A Single Machine

被引:0
|
作者
Jin, Yu-Lan [1 ]
机构
[1] Shanghai Univ Engn Sci, Sch Management, Shanghai, Peoples R China
关键词
preventive maintenance; flexible period; multi-objective optimization; SYSTEM; POLICY;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Preventive maintenance (PM) plays a very important role in production process. In this paper, the optimization PM planning in finite time horizon for a single machine with minimal repair at failures is discussed. Not only two conflicting objectives of maintenance cost and maintenance time but also two constraints of the reliability and availability of the machine are simultaneously considered in the optimization problem. Three types of PM actions including replacement, repair and mechanical service are considered. In order to make the suiTABLE PM planning, flexible period PM strategy was proposed. In this strategy, the intervals between two coterminous PM actions were with a flexible range of choice. The multiobjective genetic algorithm is used to solve the flexible period PM optimization problem. Numerical case study shows that comparing with periodic PM strategy, flexible period PM strategy can save more maintenance cost and maintenance time.
引用
收藏
页码:475 / 479
页数:5
相关论文
共 50 条
  • [21] Multi-objective optimization of a single intersection
    Jovanovic, Aleksandar
    Teodorovic, Dusan
    [J]. TRANSPORTATION PLANNING AND TECHNOLOGY, 2021, 44 (02) : 139 - 159
  • [22] Multi-objective preventive maintenance strategy and optimization considering unavailability and cost: A case study on VOBC
    Peng, Cong
    Wei, Shangguan
    Peng, Jiali
    Wang, Zongyao
    Chai, Linguo
    Cai, Baigen
    Xing, Yulong
    [J]. ALEXANDRIA ENGINEERING JOURNAL, 2024, 105 : 567 - 577
  • [23] Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization
    Wang, Du-Juan
    Liu, Feng
    Wang, Jian-Jun
    Wang, Yan-Zhang
    [J]. SOFT COMPUTING, 2016, 20 (04) : 1635 - 1652
  • [24] Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization
    Du-Juan Wang
    Feng Liu
    Jian-Jun Wang
    Yan-Zhang Wang
    [J]. Soft Computing, 2016, 20 : 1635 - 1652
  • [25] Determination of Pareto frontier in multi-objective maintenance optimization
    Certa, Antonella
    Galante, Giacomo
    Lupo, Toni
    Passannanti, Gianfranco
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (07) : 861 - 867
  • [26] Multicriteria paradigm and multi-objective optimization on maintenance modeling
    Cavalcante, C. A. V.
    de Almeida, A. T.
    [J]. ADVANCES IN SAFETY, RELIABILITY AND RISK MANAGEMENT, 2012, : 893 - 900
  • [27] Multi-objective imperfect preventive maintenance optimisation with NSGA-II
    Su, Chun
    Liu, Yang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (13) : 4033 - 4049
  • [28] MULTI-OBJECTIVE INITIAL PREVENTIVE MAINTENANCE SCHEDULING FOR LARGE ENGINEERING PLANTS
    Verma, A. K.
    Ramesh, P. G.
    [J]. INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2007, 14 (03): : 241 - 250
  • [29] Multi-objective modeling for preventive maintenance scheduling in a multiple production line
    Ebrahimipour, V.
    Najjarbashi, A.
    Sheikhalishahi, M.
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (01) : 111 - 122
  • [30] Multi-objective modeling for preventive maintenance scheduling in a multiple production line
    V. Ebrahimipour
    A. Najjarbashi
    M. Sheikhalishahi
    [J]. Journal of Intelligent Manufacturing, 2015, 26 : 111 - 122