Sequencing of Setups in Automated Setup and Fixture Planning

被引:2
|
作者
Wakhare, Mayur [1 ]
Sormaz, Dugan [1 ]
机构
[1] Ohio Univ, Dept Ind & Syst Engn, Athens, OH 45701 USA
关键词
CAD; CAPP; CAM; setup planning; tool approach direction; geometrical and dimensional tolerances; setup sequencing; feature and process precedence;
D O I
10.1016/j.promfg.2016.08.007
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The computer aided process planning (CAPP) is bridge between computer aided design (CAD) and computer aided manufacturing (CAM). Setup planning is one of the important tasks in the computer aided process planning. Setup planning consists of identification of tool approach direction (TAD), clustering the manufacturing features based on shared TAD and tolerance relations among the features, setup sequencing between the setups and operation sequencing within the setups. This paper mainly focuses on setup sequencing such that cycle precedence (conflicts between the setups) is resolved. There are most likely chances to occur cycle precedence between the setups at time of setup formation. We use an expert system (knowledge based approach) to avoid such conflicts by break down the setups into smaller setups with the minimum violation of tolerance relations. This approach gives optimal setup plan that is minimum number of setups without any cycle conflicts followed by fixture planning.
引用
收藏
页码:41 / 57
页数:17
相关论文
共 50 条
  • [21] Geometric theory on automated modular fixture planning
    Wu, Yuguang
    Gao, Shuming
    Chen, Zichen
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2002, 38 (01): : 117 - 122
  • [22] Development of an integrated system for setup planning and fixture design in CAPP
    Zhang, YR
    Peng, GL
    2005 IEEE/ASME INTERNATIONAL CONFERENCE ON ADVANCED INTELLIGENT MECHATRONICS, VOLS 1 AND 2, 2005, : 1401 - 1406
  • [23] An integrated setup/fixture planning approach for machining prismatic parts
    Sun, Xiwu
    Chu, Xuening
    Xue, Deyi
    Su, Yuliang
    Tang, Censhu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (04) : 1009 - 1027
  • [24] An integrated setup planning and fixture design system for prismatic parts
    Lin, L
    Zhang, YF
    Nee, AYC
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 1997, 10 (3-4) : 198 - 212
  • [25] Integrating the setup planning with fixture design practice by concurrent consideration of machining and fixture design principles
    Manafi, D.
    Nategh, M. J.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (09) : 2647 - 2666
  • [26] An automated design and assembly of interference-free modular fixture setup
    Kumar, AS
    Fuh, JYH
    Kow, TS
    COMPUTER-AIDED DESIGN, 2000, 32 (10) : 583 - 596
  • [27] Automated setup planning for lathe machining
    Huang, SH
    JOURNAL OF MANUFACTURING SYSTEMS, 1998, 17 (03) : 196 - 208
  • [28] Concurrent fixture design for automated manufacturing process planning
    Wentao Fu
    Matthew I. Campbell
    The International Journal of Advanced Manufacturing Technology, 2015, 76 : 375 - 389
  • [29] Stability ofWorkpkce Setup in Feature-Based Fixture Planning System
    Shen Xiaohong Liu XuanCollege of Mechanical Engineering and Automation
    CADDM, 2002, (02) : 37 - 43
  • [30] Automated assembly and fixture planning at Sandia National Laboratories
    Jones, RE
    Calton, TL
    Peters, RR
    ASSEMBLY AUTOMATION, 1997, 17 (03) : 201 - &