Sequencing of Setups in Automated Setup and Fixture Planning

被引:2
|
作者
Wakhare, Mayur [1 ]
Sormaz, Dugan [1 ]
机构
[1] Ohio Univ, Dept Ind & Syst Engn, Athens, OH 45701 USA
关键词
CAD; CAPP; CAM; setup planning; tool approach direction; geometrical and dimensional tolerances; setup sequencing; feature and process precedence;
D O I
10.1016/j.promfg.2016.08.007
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The computer aided process planning (CAPP) is bridge between computer aided design (CAD) and computer aided manufacturing (CAM). Setup planning is one of the important tasks in the computer aided process planning. Setup planning consists of identification of tool approach direction (TAD), clustering the manufacturing features based on shared TAD and tolerance relations among the features, setup sequencing between the setups and operation sequencing within the setups. This paper mainly focuses on setup sequencing such that cycle precedence (conflicts between the setups) is resolved. There are most likely chances to occur cycle precedence between the setups at time of setup formation. We use an expert system (knowledge based approach) to avoid such conflicts by break down the setups into smaller setups with the minimum violation of tolerance relations. This approach gives optimal setup plan that is minimum number of setups without any cycle conflicts followed by fixture planning.
引用
收藏
页码:41 / 57
页数:17
相关论文
共 50 条
  • [1] Setup and fixture planning in automated process planning systems
    Joneja, Ajay
    Chang, Tien-Chien
    IIE Transactions (Institute of Industrial Engineers), 1999, 31 (07): : 653 - 665
  • [2] Setup and fixture planning in automated process planning systems
    Joneja, A
    Chang, TC
    IIE TRANSACTIONS, 1999, 31 (07) : 653 - 665
  • [3] Intelligent setup generation for automated fixture planning
    Kale, MS
    Pande, SS
    FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, 1998, 1998, : 545 - 557
  • [4] Fixture and Setup Planning and Fixture Configuration System
    Attila, Retfalvi
    Stampfer, Michael
    Imre, Szegh
    FORTY SIXTH CIRP CONFERENCE ON MANUFACTURING SYSTEMS 2013, 2013, 7 : 228 - 233
  • [5] Automated setup and fixture planning system for box-shaped parts
    Stampfer, Michael
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (5-6): : 540 - 552
  • [6] Automated setup and fixture planning system for box-shaped parts
    Michael Stampfer
    The International Journal of Advanced Manufacturing Technology, 2009, 45 : 540 - 552
  • [7] Automated process planning system: A new method for setup planning and a mathematical model for fixture design
    Abedini, Vahid
    Shakeri, Mohsen
    Siahmargouei, Mohammad Hasan
    Baseri, Hamid
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2013, 227 (12) : 1849 - 1859
  • [8] Analysis of tool accessibility in fixture setup planning
    Kang, Xiumei
    Peng, Qingjin
    DETC2007: PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNOLOGY CONFERENCE AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, VOL 4, 2008, : 1007 - 1016
  • [9] AUTOMATIC SETUP PLANNING AND FIXTURE DESIGN FOR MACHINING
    SAKURAI, H
    JOURNAL OF MANUFACTURING SYSTEMS, 1992, 11 (01) : 30 - 37
  • [10] Development of automated fixture planning systems
    Ma, W
    Li, J
    Rong, Y
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1999, 15 (03): : 171 - 181