Risk Assessment of Optimal Sidetrack Time

被引:1
|
作者
Orodu, O. D. [1 ]
Ako, C. T. [1 ]
Craig, A. J. [1 ]
机构
[1] Covenant Univ, Dept Petr Engn, Ota, Ogun State, Nigeria
关键词
Monte-Carlo; optimization; risk assessment; sidetrack; water-flooding;
D O I
10.1080/10916466.2010.549888
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Optimal time of sidetrack is evaluated considering the uncertainties of reservoir variables as it affects production performance and economics based on the uncertainty associated with the sidetrack operation. Analytical production performance schemes are applied to study scenarios of production under natural decline and water-flood recovery using Monte Carlo simulation. Caution should be exercised on assumptions made to simplify the objective function, as it may not truly represent subsurface flow. Full evaluation of sensitivity of time to reservoir variables is possible using a proxy-model based on experimental design due to the complex physical phenomenon of subsurface flow.
引用
收藏
页码:1585 / 1594
页数:10
相关论文
共 50 条
  • [21] Time to update carcinogen risk assessment
    Huggett, RJ
    Wiltse, JA
    ISSUES IN SCIENCE AND TECHNOLOGY, 1996, 12 (04) : 24 - 28
  • [22] Time to Modernize Privacy Risk Assessment
    Shapiro, Stuart S.
    ISSUES IN SCIENCE AND TECHNOLOGY, 2021, 38 (01) : 20 - 22
  • [23] Time for risk assessment without borders
    Al-Mallah, Mouaz H.
    Villines, Todd C.
    ATHEROSCLEROSIS, 2018, 279 : 93 - 94
  • [24] The role of time in environmental risk assessment
    Karman, CC
    SPILL SCIENCE & TECHNOLOGY BULLETIN, 2000, 6 (02) : 159 - 164
  • [25] Is it time to abandon suicide risk assessment?
    Murray, Declan
    BJPSYCH OPEN, 2016, 2 (01): : E1 - E2
  • [26] Time capsule for landslide risk assessment
    Lei, Yu
    Huang, Jinsong
    Cui, Yifei
    Jiang, Shui-Hua
    Wu, Shengnan
    Ching, Jianye
    GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2023, 17 (04) : 613 - 634
  • [27] Optimal risk assessment for estimating the VSD in experiment carcinogenesis
    Kitsos, CP
    Limakopoulou, A
    MEDICAL INFOBAHN FOR EUROPE, PROCEEDINGS, 2000, 77 : 763 - 766
  • [28] Optimal Decisions and Risk Assessment in Sustainable Supply Chains
    Turki, Sadok
    Sauvey, Christophe
    Dellagi, Sofiene
    Rezg, Nidhal
    SUSTAINABILITY, 2021, 13 (21)
  • [29] An Optimal Scheduling Dispatch of a Microgrid under Risk Assessment
    Lin, Whei-Min
    Yang, Chung-Yuen
    Tu, Chia-Sheng
    Tsai, Ming-Tang
    ENERGIES, 2018, 11 (06):
  • [30] Pediatric Appendectomy: Optimal Surgical Timing and Risk Assessment
    Burjonrappa, Sathyaprasad
    Rachel, Dana
    AMERICAN SURGEON, 2014, 80 (05) : 496 - 499