PROJECT RISK RANKING BASED ON PRINCIPAL COMPONENT ANALYSIS - AN EMPIRICAL STUDY IN MALAYSIA-SINGAPORE CONTEXT

被引:0
|
作者
Pang, Der-Jiun [1 ]
Shavarebi, Kamran [2 ]
Ng, Sokchoo [1 ]
机构
[1] Int Univ Malaya Wales IUMW, Fac Arts & Sci, Blok & Blok C,Kampus Kota, Kuala Lumpur 50480, Malaysia
[2] INTI Int Univ, Fac Engn & Quant Surveying, Persiaran Perdana BBN, Putra Nilai 71800, Nilai, Malaysia
来源
INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL | 2022年 / 18卷 / 06期
关键词
Project risk; Ranking; Assessment; Analysis; Principal component analysis; MANAGEMENT; GOVERNANCE; PERCEPTION; SUCCESS; MODEL;
D O I
10.24507/ijicic.18.06.1857
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Information Technology (IT) remains a robust and sustainable industry, re-sulting in high demand for IT project practitioners. Nevertheless, the high failure rate of IT projects has resulted in significant losses for many companies. This crucial issue needs immediate attention. One of the focusing points should be adopting a practical and proactive project risk management approach. This study aims to determine whether Prin-cipal Component Analysis (PCA) can be used in project risk management. The survey was conducted on targeted project managers in the Malaysia-Singapore region. Under-lying trends and patterns were analyzed based on an intrinsic risk ranking study. PCA was performed to isolate highly associated key risks from less associated lower-ranked risks. As a result, PCA effectively removed weakly correlated risk factors while identify-ing significant components and retaining the data information. The results showed that combining PCA with established risk management approaches provides a credible risk assessment based on criticality.
引用
收藏
页码:1857 / 1870
页数:14
相关论文
共 50 条
  • [21] An analysis on risk of ULC project based on principal - Agent theory
    Dong, Li-Min
    Proceedings of the 2006 International Conference on Management Science and Engineering, 2006, : 661 - 665
  • [22] A Study on Cost Drivers Based on Principal Component Analysis
    Zhan Yonghong
    Xiong Yanchao
    PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2010, : 1639 - 1643
  • [23] Risk Assessment in Electrical Power Network Planning Project Based on Principal Component Analysis and Support Vector Machine
    Sun, Wei
    Ma, Yue
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 5268 - 5271
  • [24] Empirical Research of Shanghai Scientific and Technological Competitiveness -Based on Principal Component Analysis
    Su, Lin
    Wang, Xia
    Guo, Bing
    PROCEEDING OF 2012 INTERNATIONAL SYMPOSIUM ON MANAGEMENT OF TECHNOLOGY (ISMOT'2012), 2012, : 501 - 505
  • [25] Research on Comprehensive Bid Evaluation of Construction Project Based on the Principal Component Analysis
    Pang, Nansheng
    Shi, Yingling
    Ji, Changming
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 5412 - 5416
  • [26] Research on aerospace enterprise risk evaluation based on principal component analysis
    Dong, Pei-Wu
    Zhao, Feng-Xue
    Li, Ming-Xing
    Yuhang Xuebao/Journal of Astronautics, 2002, 23 (04): : 88 - 91
  • [27] Credit Risk Assessment Based on Fuzzy SVM and Principal Component Analysis
    Min, Zhao
    WISM: 2009 INTERNATIONAL CONFERENCE ON WEB INFORMATION SYSTEMS AND MINING, PROCEEDINGS, 2009, : 125 - 127
  • [28] Empirical Study Based on Principal Component Analysis on Measurement Model for Quality of public employment Service in Developed Area
    Kong Weiwei
    Lu Chunyan
    STATISTIC APPLICATION IN MODERN SOCIETY, 2015, : 522 - 528
  • [29] Choice of Cumulative Percentage in Principal Component Analysis for Regionalization of Peninsular Malaysia Based on the Rainfall Amount
    Shaharudin, Shazlyn Milleana
    Ahmad, Norhaiza
    MODELING, DESIGN AND SIMULATION OF SYSTEMS, ASIASIM 2017, PT II, 2017, 752 : 216 - 224
  • [30] The Study of the Development of Rail Freight Based on Principal Component Analysis
    Zhang, Cheng
    Zhang, Guangsheng
    INNOVATION AND SUSTAINABILITY OF MODERN RAILWAY, 2012, : 862 - 866