Comparison of emissions from light rail transit and bus rapid transit

被引:22
|
作者
Puchalsky, CM [1 ]
机构
[1] Univ Penn, Dept Elect & Syst Engn, Philadelphia, PA 19104 USA
关键词
D O I
10.3141/1927-04
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bus rapid transit (BRT) is an evolving and promising transit mode that has emerged as a low-cost competitor to light rail transit (LRT) in providing medium-capacity semirapid transit. In addition, recent advances in diesel and compressed natural gas technology have caused the truism "electric rail is cleaner than diesel bus" to be revisited. A partial fuel cycle comparison of the regional or urban emissions of carbon monoxide, oxides of nitrogen, and volatile organic compounds from BRT and LRT is presented. The BRT analysis includes tailpipe exhaust emissions and fuel transportation, storage, and distribution emissions. The LRT analysis contains electric power plant emissions and line-loss-induced emissions. The analysis shows that whenever equal levels of technology are compared, LRT consistently performs better than BRT despite recent advances in the BRT mode. The analysis also shows that both modes are cleaner now than in the past.
引用
收藏
页码:31 / 37
页数:7
相关论文
共 50 条
  • [1] A Light Rail, Group Rapid Transit, Personal Rapid Transit Comparison
    Muller, Peter J.
    Andreasson, Ingmar J.
    [J]. AUTOMATED PEOPLE MOVERS AND AUTOMATED TRANSIT SYSTEMS 2018: MOVING TO THE FUTURE, BUILDING ON THE PAST, 2018, : 1 - 11
  • [2] Cross-cultural Contrasts of Preferences for Bus Rapid Transit and Light Rail Transit
    Hensher, David A.
    Balbontin, Camila
    Ho, Chinh Q.
    Mulley, Corinne
    [J]. JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 2019, 53 : 47 - 73
  • [3] Exploring Comparative Ridership Drivers of Bus Rapid Transit and Light Rail Transit Routes
    Currie, Graham
    Delbosc, Alexa
    [J]. JOURNAL OF PUBLIC TRANSPORTATION, 2013, 16 (02) : 47 - 65
  • [5] Bus rapid transit or light, rail transit - How to decide? Los Angeles case study
    Stutsman, JM
    [J]. TRANSIT: INTERMODAL FACILITIES, RAIL TRANSIT, COMMUTER RAIL, LIGHT RAIL TRANSIT, MAINTENANCE, AND FERRY TRANSPORTATION: PUBLIC TRANSIT, 2002, (1793): : 55 - 61
  • [6] Designing bus rapid transit for light rail transit convertibility - Introduction for planners and decision makers
    Wood, Eva
    Shelton, David S.
    Shelden, Matt
    [J]. TRANSIT: INTERMODAL TRANSFER FACILITIES AND FERRY TRANSPORTATION; COMMUTER RAIL; LIGHT RAIL AND MAJOR ACTIVITY CENTER CIRCULATION SYSTEMS; CAPACITY AND QUALITY OF SERVICE, 2006, (1955): : 47 - 55
  • [7] Efficient Space Dedication to Bus Rapid Transit and Light Rail Systems
    Tsao, H. -S. Jacob
    Pratama, Agus
    [J]. JOURNAL OF PUBLIC TRANSPORTATION, 2013, 16 (03) : 79 - 94
  • [8] COMPARISON BETWEEN BUS RAPID TRANSIT AND LIGHT-RAIL TRANSIT SYSTEMS: A MULTI-CRITERIA DECISION ANALYSIS APPROACH
    Lopez Lambas, Maria Eugenia
    Giuffrida, Nadia
    Ignaccolo, Matteo
    Inturri, Giuseppe
    [J]. URBAN TRANSPORT XXIII, 2018, 176 : 143 - 154
  • [9] Comparison of emissions from light rail transit, electric commuter rail, and diesel multiple units
    Messa, Christina A.
    [J]. TRANSIT: INTERMODAL TRANSFER FACILITIES AND FERRY TRANSPORTATION; COMMUTER RAIL; LIGHT RAIL AND MAJOR ACTIVITY CENTER CIRCULATION SYSTEMS; CAPACITY AND QUALITY OF SERVICE, 2006, (1955): : 26 - 33
  • [10] Why is Light Rail Starting to Dominate Bus Rapid Transit Yet Again?
    Hensher, David A.
    [J]. TRANSPORT REVIEWS, 2016, 36 (03) : 289 - 292