An earned value model with risk analysis for project management under uncertain conditions

被引:33
|
作者
Moradi, Navid [1 ]
Mousavi, S. Meysam [1 ]
Vandani, Behnam [2 ]
机构
[1] Shahed Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Islamic Azad Univ, Qazvin Branch, Fac Ind & Mech Engn, Qazvin, Iran
关键词
Earned value management; cost and schedule of projects; risk analysis; interval-valued triangular fuzzy numbers; CONSTRUCTION PROJECTS; FUZZY; SELECTION; COST; RANKING; VIKOR;
D O I
10.3233/JIFS-151139
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Earned value is a renowned project management technique that integrates the information on cost and schedule of projects to evaluate their current status. Despite the ability of earned value management (EVM) to measure and control the current status, it is not able to estimate the projects' future performances because EVM does not consider the changes in environmental circumstances or other elements that could influence on the future performance of the project. In the contrary with EVM, the risk analysis technique regards risky conditions for the future performance of the project by recognizing and analyzing the opportunities and threats. In this paper, a new evaluation model of the EVM blended with the risk analysis is presented to improve the project future performance forecasting. In addition, these indices and evaluations are defined under real-life uncertain conditions using linguistic variables represented by interval-valued triangular fuzzy numbers. Finally, a case study from the recent literature for construction industry is given in this paper to show the effectiveness of the proposed EVM model under uncertain conditions.
引用
收藏
页码:97 / 113
页数:17
相关论文
共 50 条
  • [21] Combination of Project Cost Forecasts in Earned Value Management
    Kim, Byung-Cheol
    Reinschmidt, Kenneth F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (11): : 958 - 966
  • [22] Earned-Value Based Project Management Incentive Contracts under Chinese Guanxi
    Dai Chun-ai
    Tang Xiao-wo
    2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (15TH), VOLS I AND II, CONFERENCE PROCEEDINGS, 2008, : 1585 - 1590
  • [23] Earned value project management: Improving the predictive power of planned value
    Chen, Hong Long
    Chen, Wei Tong
    Lin, Ying Lien
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (01) : 22 - 29
  • [24] The Application of Improved Earned Value Management Method in Engineering Project Management
    Gao Xiuju
    MOT2009: PROCEEDINGS OF ZHENGZHOU CONFERENCE ON MANAGEMENT OF TECHNOLOGY, VOLS I AND II, 2009, : 383 - 387
  • [25] Conditions of success for earned value analysis in projects
    Bryde, David
    Unterhitzenberger, Christine
    Joby, Roger
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (03) : 474 - 484
  • [26] Limit State Earned Value Analysis Impact on Network Security Project Management Decisions
    Staley, Michael
    2016 IEEE INTERNATIONAL CARNAHAN CONFERENCE ON SECURITY TECHNOLOGY (ICCST), 2016, : 100 - 106
  • [27] Application of improved earned value method in project management processes
    Qiao, Li-Hong
    Guo, Guang-Xin
    Yang, Zhi-Bing
    Beijing Ligong Daxue Xuebao/Transaction of Beijing Institute of Technology, 2010, 30 (01): : 33 - 36
  • [28] Classification of articles and journals on project control and earned value management
    Willems, Laura L.
    Vanhoucke, Mario
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (07) : 1610 - 1634
  • [29] Earned Value Project Management, 4th Edition
    Rose, Kenneth H.
    PROJECT MANAGEMENT JOURNAL, 2011, 42 (03) : 103 - 103
  • [30] Project review in the project management: an investigation study on earned value and balanced scorecard
    Eleyan, Derar
    El-Sawalhi, Nabil
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2010, 13 (06): : 1187 - 1209