An earned value model with risk analysis for project management under uncertain conditions

被引:33
|
作者
Moradi, Navid [1 ]
Mousavi, S. Meysam [1 ]
Vandani, Behnam [2 ]
机构
[1] Shahed Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Islamic Azad Univ, Qazvin Branch, Fac Ind & Mech Engn, Qazvin, Iran
关键词
Earned value management; cost and schedule of projects; risk analysis; interval-valued triangular fuzzy numbers; CONSTRUCTION PROJECTS; FUZZY; SELECTION; COST; RANKING; VIKOR;
D O I
10.3233/JIFS-151139
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Earned value is a renowned project management technique that integrates the information on cost and schedule of projects to evaluate their current status. Despite the ability of earned value management (EVM) to measure and control the current status, it is not able to estimate the projects' future performances because EVM does not consider the changes in environmental circumstances or other elements that could influence on the future performance of the project. In the contrary with EVM, the risk analysis technique regards risky conditions for the future performance of the project by recognizing and analyzing the opportunities and threats. In this paper, a new evaluation model of the EVM blended with the risk analysis is presented to improve the project future performance forecasting. In addition, these indices and evaluations are defined under real-life uncertain conditions using linguistic variables represented by interval-valued triangular fuzzy numbers. Finally, a case study from the recent literature for construction industry is given in this paper to show the effectiveness of the proposed EVM model under uncertain conditions.
引用
收藏
页码:97 / 113
页数:17
相关论文
共 50 条
  • [1] Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management
    Miguel, Angelimarie
    Madria, Wira
    Polancos, Ronaldo
    2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 622 - 628
  • [2] Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions
    Anbari Moghadam M.
    Bagherpour M.
    Ghannadpour S.F.
    Environment Systems and Decisions, 2024, 44 (1) : 45 - 68
  • [3] Earned value project management
    Fleming, Quentin W.
    Koppelman, Joel M.
    Cost Engineering (Morgantown, West Virginia), 1997, 39 (02): : 13 - 15
  • [4] Project management: Earned value management
    Duncan, B
    TECHNOLOGY OF OBJECT-ORIENTED LANGUAGES AND SYSTEMS - TOOLS 34, PROCEEDINGS, 2000, : 513 - 514
  • [5] Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control
    Song, Jie
    Martens, Annelies
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (02) : 451 - 466
  • [6] The Application of Earned Value in Project Management
    Lv, Xiuling
    Wu, Jiangfeng
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2844 - 2847
  • [7] Using earned-value analysis for better project management
    Hayes, HB
    Miller, J
    BIOPHARM-THE APPLIED TECHNOLOGIES OF BIOPHARMACEUTICAL DEVELOPMENT, 2002, 15 (03): : 58 - 59
  • [8] Improvement and application of earned value analysis in coal project management
    Zhong, Shuheng
    Wang, Xin
    ISMSSE 2011, 2011, 26
  • [9] Study on project management of railway engineering project base on earned value analysis
    Lizeng, Li
    Tongyin, Han
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 405 - 407
  • [10] Earned value project management of model-centric software development
    Li Jin-hua
    Wei Chang-jiang
    Li Jing
    Li Qiong
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 12694 - 12697