Real-Time Disruption Recovery for Integrated Berth Allocation and Crane Assignment in Container Terminals

被引:36
|
作者
Li, Meng Ze [1 ]
Jin, Jian Gang [1 ]
Lu, Chun Xia [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Naval Architecture & Ocean & Civil Engn, Shanghai 200030, Peoples R China
基金
中国国家自然科学基金;
关键词
SCHEDULING PROBLEM;
D O I
10.3141/2479-07
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper studies disruption recovery optimization for the integrated berth allocation and quay crane assignment problem in container terminals. The proposed reactive recovery strategy adjusts the initial plan to handle realistic disruptions. In the proposed recovery strategy, new berthing positions for vessels are restricted within a certain space. Quay cranes are allowed to move to other vessels before finishing current assigned vessels. Vessels requiring early dispatch are particularly considered in recovery planning. A proposed nonlinear programming model maximizes the service quality and minimizes the recovery cost at the same time. A heuristic approach based on squeaky wheel optimization is developed to solve the model. Computational experiments are conducted to show the performance and effectiveness of the proposed model and solution method.
引用
收藏
页码:49 / 59
页数:11
相关论文
共 50 条
  • [1] Optimal berth allocation and time-invariant quay crane assignment in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 235 (01) : 88 - 101
  • [2] Disruption recovery model for berth and quay crane scheduling in container terminals
    Zeng, Qingcheng
    Yang, Zhongzhen
    Hu, Xiangpei
    [J]. ENGINEERING OPTIMIZATION, 2011, 43 (09) : 967 - 983
  • [3] Model for disruption management of berth allocation & quay crane scheduling in container terminals
    Zeng, Qing-Cheng
    Hu, Xiang-Pei
    Yang, Zhong-Zhen
    [J]. Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2026 - 2035
  • [4] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [5] An Online Model of Berth and Quay Crane Integrated Allocation in Container Terminals
    Zheng, Feifeng
    Qiao, Longliang
    Liu, Ming
    [J]. COMBINATORIAL OPTIMIZATION AND APPLICATIONS, (COCOA 2015), 2015, 9486 : 721 - 730
  • [6] Integrated continuous berth allocation and quay crane assignment and scheduling problem with time-dependent physical constraints in container terminals
    Malekahmadi, Amirsalar
    Alinaghian, Mehdi
    Hejazi, Seyed Reza
    Saidipour, Mohammad Ali Assl
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 147
  • [7] A Framework for Integrated Berth Allocation and Crane Operations Planning in Seaport Container Terminals
    Meisel, Frank
    Bierwirth, Christian
    [J]. TRANSPORTATION SCIENCE, 2013, 47 (02) : 131 - 147
  • [8] Integrated discrete berth allocation and quay crane scheduling in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    [J]. ENGINEERING OPTIMIZATION, 2010, 42 (08) : 747 - 761
  • [9] Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
    Aras, Necati
    Turkogullari, Yavuz
    Taskin, Z. Caner
    Altinel, Kuban
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2012, 2014, : 101 - 107
  • [10] Berth allocation recovery for container transshipment terminals
    Lv, Xiaohuan
    Jin, Jian Gang
    Hu, Hao
    [J]. MARITIME POLICY & MANAGEMENT, 2020, 47 (04) : 558 - 574